SC 65E |
Devices and integration in enterprise systems |

|
Project Reference |
Document Reference |
Init. Date |
Current Stage |
Next Stage |
Working Group |
Project Leader |
Fcst. Publ. Date |
|---|---|---|---|---|---|---|---|
|
PNW 65E-1006 ED1
ENGINEERING DATA EXCHANGE FORMAT FOR USE IN INDUSTRIAL AUTOMATION SYSTEMS ENGINEERING - Automation Markup Language - Part 6: AutomationML Components
|
65E/1006/NP |
PRVN
2023-05 |
2023-06 |
WG 9 | Nicole Schmidt | 2026-04 | |
|
IEC 61406-2 ED1
Identification Link - Part 2: Types/Models, Lots/Batches, Items and Characteristics
|
65E/1000/CDV | 2022-12 |
CCDV
2023-05 |
PRVC
2023-08 |
WG 2 | Rainer Schrundner | 2024-05 |
|
IEC 61987-1 ED2
Industrial-process measurement and control - Data structures and elements in process equipment catalogues - Part 1: Measuring equipment with analogue and digital output
|
65E/995/RR | 2023-03 |
ACD
2023-03 |
CD
2023-03 |
WG 2 | Peter Berrie | 2025-01 |
|
IEC 61987-32 ED1
Industrial-process measurement and control - Data structures and elements in process equipment catalogues - Part 32: Lists of properties (LOP) for I/O modules for electronic data exchange
|
65E/934/CDV | 2018-09 |
APUB
2023-03 |
2023-10 |
WG 2 | Klaus Dickmann | 2024-02 |
|
IEC 61987-41 ED1
IEC 61987, Part 41: Generic structures of List of Properties (LOP) of Process Analyzer Technology (PAT) measuring devices for electronic data exchange
|
65E/945/CD | 2022-03 |
PCC
2023-03 |
2023-04 |
WG 2 | Rainer Kullmann | 2024-10 |
|
IEC 61987-100 ED1
Industrial-process measurement and control - Data structures and elements
|
65E/937/NP | 2023-02 |
ACD
2023-02 |
CD
2024-02 |
WG 2 | Klaus Dickmann | 2025-01 |
|
IEC 62264-2 ED3
Enterprise-control system integration - Part 2: Object and attributes for enterprise-control system integration
|
65E/960/CD | 2022-03 |
PCC
2023-04 |
2023-05 |
JWG 5 | Chris Monchinski | 2024-08 |
|
IEC 62264-4 ED2
Enterprise-control system integration - Part 4: Objects models attributes for manufacturing operations management integration
|
65E/961/CD | 2022-03 |
PCC
2023-04 |
2023-05 |
JWG 5 | Chris Monchinski | 2024-08 |
|
IEC 62264-5 ED3
Enterprise-control system integration - Part 5: Business to manufacturing transactions
|
65E/985/CD | 2022-03 |
PCC
2023-04 |
2023-05 |
JWG 5 | Chris Monchinski | 2024-08 |
|
IEC 62264-7 ED1
Enterprise-control system integration – Part 7 Alias Service Model |
65E/704/NP | 2020-08 |
ACD
2022-02 |
CD
2022-08 |
JWG 5 | Chris Monchinski | 2024-06 |
|
IEC 62381 ED3
Automation systems in the process industry - Factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT)
|
65E/929/CD | 2020-09 |
ACDV
2023-03 |
TCDV
2023-09 |
WG 3 | Marco Boll | 2024-05 |
|
IEC 62382 ED3
Control systems in the process industry - Electrical and instrumentation loop check
|
65E/930/CD | 2020-09 |
ACDV
2023-03 |
TCDV
2023-09 |
WG 3 | Marco Boll | 2024-05 |
|
IEC 62453-1 ED3
Field device tool (FDT) interface specification - Part 1: Overview and guidance
|
65E/872/CDV | 2020-09 |
RPUB
2023-01 |
BPUB
2023-03 |
WG 4 | Christian Diedrich | 2023-07 |
|
IEC TR 62453-42 ED2
Field device tool (FDT) interface specification - Part 42: Object model integration profile - Common Language Infrastructure
|
65E/881/DTR |
2020-09 |
APUB
2022-05 |
TPUB
2022-08 |
WG 4 | Christian Diedrich | 2023-10 |
|
IEC TR 62453-43 ED1
Field Device Tool (FDT) Interface Specification - Part 43: Object model integration profile – CLI and HTML
|
65E/873/CD | 2022-01 |
ADTR
2022-05 |
TDTR
2022-10 |
2024-03 | ||
|
IEC TR 62453-51-20 ED2
Field device tool (FDT) interface specification - Part 51-20: Communication implementation for common object model - IEC 61784 CPF 2
|
65E/882/DTR |
2020-09 |
APUB
2022-05 |
TPUB
2022-08 |
WG 4 | Christian Diedrich | 2023-10 |
|
IEC TR 62453-52-31 ED2
Field device tool (FDT) interface specification - Part 52-31: Communication implementation for common language infrastructure - IEC 61784 CP 3/1 and CP 3/2
|
65E/883/DTR |
2020-09 |
APUB
2022-05 |
TPUB
2022-08 |
WG 4 | Christian Diedrich | 2023-10 |
|
IEC TR 62453-52-90 ED2
Field device tool (FDT) interface specification - Part 52-90: Communication implementation for common language infrastructure - IEC 61784 CPF 9
|
65E/884/DTR |
2020-09 |
APUB
2022-05 |
TPUB
2022-08 |
WG 4 | Christian Diedrich | 2023-10 |
|
IEC TS 62453-53-31 ED1
Field Device Tool (FDT) Interface Specification - Part 53-31: Communication implementation for CLI and HTML – IEC 61784 CP 3/1 and CP 3/2
|
65E/947/NP | 2023-04 |
ADTS
2023-04 |
TDTS
2023-04 |
WG 4 | Christian Diedrich | 2024-06 |
|
IEC TR 62453-53-31 ED1
Field Device Tool (FDT) Interface Specification - Part 53-31: Communication implementation for CLI and HTML – IEC 61784 CP 3/1 and CP 3/2
|
65E/874/CD | 2022-01 |
ADTR
2022-05 |
TDTR
2022-10 |
2024-03 | ||
|
IEC TS 62453-53-90 ED1
Field Device Tool (FDT) Interface Specification - Part 53-90: Communication implementation for CLI and HTML – IEC 61784 CPF 9
|
65E/948/NP | 2023-04 |
ADTS
2023-04 |
TDTS
2023-04 |
WG 4 | Christian Diedrich | 2024-06 |
|
IEC TR 62453-53-90 ED1
Field Device Tool (FDT) Interface Specification - Part 53-90: Communication implementation for CLI and HTML – IEC 61784 CPF 9
|
65E/875/CD | 2022-01 |
ADTR
2022-05 |
TDTR
2022-10 |
2024-03 | ||
|
IEC 62453-71 ED1
Field device tool (FDT) interface specification – Part 71: OPC UA Information Model for FDT |
65E/806/CDV | 2020-05 |
APUB
2022-12 |
2022-12 |
WG 4 | Christian Diedrich | 2023-09 |
|
IEC 62453-302 ED3
Field device tool (FDT) interface specification - Part 302: Communication profile integration - IEC 61784 CPF 2
|
65E/791/CDV | 2020-09 |
RFDIS
2022-12 |
CFDIS
2023-03 |
WG 4 | Christian Diedrich | 2023-09 |
|
IEC 62541-1 ED1
OPC Unified Architecture – Part 1: Overview and Concepts
|
65E/949/NP | 2023-05 |
ACDV
2023-05 |
TCDV
2023-06 |
WG 8 | Ingo Weber | 2024-12 |
|
IEC 62541-2 ED1
OPC Unified Architecture – Part 2: Security Model
|
65E/950/NP | 2023-05 |
ACDV
2023-05 |
TCDV
2023-06 |
WG 8 | Ingo Weber | 2024-12 |
|
IEC 62541-3 ED4
OPC Unified Architecture - Part 3: Address Space Model
|
65E/975/RR | 2023-01 |
ACDV
2023-01 |
TCDV
2023-06 |
WG 8 | Ingo Weber | 2024-06 |
|
IEC 62541-4 ED4
OPC Unified Architecture - Part 4: Services
|
65E/976/RR | 2023-01 |
ACDV
2023-01 |
TCDV
2023-06 |
WG 8 | Ingo Weber | 2024-06 |
|
IEC 62541-5 ED4
OPC Unified Architecture - Part 5: Information Model
|
65E/977/RR | 2023-01 |
ACDV
2023-01 |
TCDV
2023-06 |
WG 8 | Ingo Weber | 2024-06 |
|
IEC 62541-6 ED4
OPC Unified Architecture - Part 6: Mappings
|
65E/978/RR | 2023-01 |
ACDV
2023-01 |
TCDV
2023-06 |
WG 8 | Ingo Weber | 2024-06 |
|
IEC 62541-7 ED4
OPC Unified Architecture - Part 7: Profiles
|
65E/979/RR | 2023-01 |
ACDV
2023-01 |
TCDV
2023-06 |
WG 8 | Ingo Weber | 2024-06 |
|
IEC 62541-8 ED4
OPC Unified Architecture - Part 8: Data Access
|
65E/980/RR | 2023-01 |
ACDV
2023-01 |
TCDV
2023-06 |
WG 8 | Ingo Weber | 2024-06 |
|
IEC 62541-9 ED4
OPC Unified Architecture - Part 9: Alarms and Conditions
|
65E/981/RR | 2023-01 |
ACDV
2023-01 |
TCDV
2023-06 |
WG 8 | Ingo Weber | 2024-06 |
|
IEC 62541-10 ED4
OPC Unified Architecture - Part 10: Programs
|
65E/982/RR | 2023-01 |
ACDV
2023-01 |
TCDV
2023-06 |
WG 8 | Ingo Weber | 2024-06 |
|
IEC 62541-11 ED3
OPC Unified Architecture - Part 11: Historical Access
|
65E/983/RR | 2023-01 |
ACDV
2023-01 |
TCDV
2023-06 |
WG 8 | Ingo Weber | 2024-06 |
|
IEC 62541-12 ED2
OPC Unified Architecture - Part 12: Discovery and global services
|
65E/973/RR | 2023-01 |
ACDV
2023-01 |
TCDV
2023-06 |
WG 8 | Ingo Weber | 2024-06 |
|
IEC 62541-13 ED3
OPC Unified Architecture - Part 13: Aggregates
|
65E/984/RR | 2023-01 |
ACDV
2023-01 |
TCDV
2023-06 |
WG 8 | Ingo Weber | 2024-06 |
|
IEC 62541-14 ED2
OPC Unified Architecture - Part 14: PubSub
|
65E/974/RR | 2023-01 |
ACDV
2023-01 |
TCDV
2023-06 |
WG 8 | Ingo Weber | 2024-06 |
|
IEC 62541-16 ED1
OPC Unified Architecture – Part 16: State Machines
|
65E/951/NP | 2023-05 |
ACDV
2023-05 |
TCDV
2023-06 |
WG 8 | Ingo Weber | 2024-12 |
|
IEC 62541-17 ED1
OPC Unified Architecture – Part 17: Alias Names
|
65E/952/NP | 2023-05 |
ACDV
2023-05 |
TCDV
2023-06 |
WG 8 | Ingo Weber | 2024-12 |
|
IEC 62541-18 ED1
OPC Unified Architecture – Part 18: Role-Based Security
|
65E/953/NP | 2023-05 |
ACDV
2023-05 |
TCDV
2023-06 |
WG 8 | Ingo Weber | 2024-12 |
|
IEC 62541-19 ED1
OPC Unified Architecture – Part 19: Dictionary Reference
|
65E/954/NP | 2023-05 |
ACDV
2023-05 |
TCDV
2023-06 |
WG 8 | Ingo Weber | 2024-12 |
|
IEC 62541-20 ED1
OPC Unified Architecture – Part 20: File Transfer
|
65E/955/NP | 2023-05 |
ACDV
2023-05 |
TCDV
2023-06 |
WG 8 | Ingo Weber | 2025-01 |
|
IEC 62541-21 ED1
OPC Unified Architecture – Part 21: Device Onboarding
|
65E/956/NP | 2023-05 |
ACDV
2023-05 |
TCDV
2023-06 |
WG 8 | Ingo Weber | 2024-12 |
|
IEC 62541-22 ED1
OPC Unified Architecture – Part 22: Base Network Model
|
65E/957/NP | 2023-05 |
ACDV
2023-05 |
TCDV
2023-06 |
WG 8 | Ingo Weber | 2025-01 |
|
IEC 62541-23 ED1
OPC Unified Architecture – Part 23: Common ReferenceTypes
|
65E/958/NP | 2023-05 |
ACDV
2023-05 |
TCDV
2023-06 |
WG 8 | Ingo Weber | 2024-12 |
|
IEC 62541-24 ED1
OPC Unified Architecture – Part 24: Scheduler
|
65E/959/NP | 2023-05 |
ACDV
2023-05 |
TCDV
2023-06 |
WG 8 | Ingo Weber | 2024-12 |
|
IEC 62541-100 ED2
OPC Unified Architecture - Part 100: Device Interface
|
65E/972/RR | 2023-01 |
ACDV
2023-01 |
TCDV
2023-06 |
WG 8 | Ingo Weber | 2024-06 |
|
IEC TS 62545-43 ED1
Field Device Tool (FDT) Interface Specification - Part 43: Object model integration profile – CLI and HTML
|
65E/946/NP | 2023-04 |
ADTS
2023-04 |
TDTS
2023-04 |
WG 4 | Christian Diedrich | 2024-06 |
|
IEC 63082-1 ED1
Intelligent Device Management – Part 1: Concepts and Terminology
|
65E/888/NP | 2022-07 |
ACD
2022-07 |
CD
2023-10 |
WG 10 | Ian Verhappen | 2025-04 |
|
IEC 63082-2 ED1
Intelligent Device Management – Part 2: Normative Requirements and Recommendations
|
65E/990/CDV | 2020-02 |
CCDV
2023-04 |
PRVC
2023-07 |
WG 10 | Ian Verhappen | 2024-05 |
|
IEC 63261 ED1
Representation of electrical & instrument objects in digital 3D plant models during engineering
|
65E/938/CD | 2019-07 |
TCDV
2023-05 |
CCDV
2023-07 |
WG 13 | Carsten Bödege | 2024-08 |
|
IEC 63270 ED1
Industrial automation equipment and systems - Predictive maintenance
|
65E/877/CD | 2019-10 |
PCC
2022-04 |
2022-05 |
WG 12 | Chengcheng Wang | 2024-06 |
|
IEC 63280 ED1
Automation engineering of modular systems in the process industry – General concept and interfaces
|
65E/663/NP | 2019-12 |
ACD
2019-12 |
CD
2024-03 |
WG 14 | Gerald Mayr | 2024-05 |
|
IEC 63489 ED1
DB - Common data concepts for smart manufacturing
|
65E/928/NP | 2023-02 |
ACDV
2023-02 |
TCDV
2024-04 |
WG 2 | Thomas Hadlich | 2025-06 |
