TC 99 |
Insulation co-ordination and system engineering of high voltage electrical power installations above 1,0 kV AC and 1,5 kV DC |

TC 99 Scope
Standardisation of -
a) insulation co-ordination for high voltage systems in specifying basic principles of insulation co-ordination, definitions and standard insulation levels for all type of electrical equipment considering field of applications, minimum air clearances, test requirements and test procedures; and
b) common rules and particular requirements for system engineering and erection of high voltage electrical power installations for power generation, transmission, distribution, and consumer premises, in both indoor and outdoor situations, with particular consideration of safety aspects