ISO/IEC JTC 1/SC 25

Interconnection of information technology equipment

 

Approval

P-Members

Voting
P-Members

Approving
Approval %
Criteria
Result
13 13 100 >=66.7% APPROVED

Participation

Number of

P-Members
P-Members

approving and

participating
Criteria
Result
29 6 >=4 (if <=16)
>=5 (if >=17)
APPROVED

 Illustration: Voting

Voting Result

APPROVED

Document JTC1-SC25/3003/NP

 

Project : PNW JTC1-SC25-3003 ED1

PNW JTC1-SC25-3003 ED1: ISO/IEC 10192-4-2: Information technology – Home Electronic System (HES) interfaces – Part 4-2: Common user interface and cluster-to-cluster interface to support interworking among home cluster systems – Interfaces, services and objects

 

Reference Circulation date Closing date Downloads
JTC1-SC25/3003/NP 2021-01-15 2021-04-09
Compilation of Comments
CC file    
 
export to xls file

Result of Voting

Country
Status
Received
Approving
CD
CDV
Participation
Comments
Argentina O -
Australia P 2021-03-30 Y Y Y -
Austria P 2021-04-08 A Y N -
Belgium P 2021-04-08 A N -
Bosnia & Herzegovina O -
Canada P 2021-04-06 Y Y Y Y
China P 2021-03-29 Y Y Y -
Croatia O -
Cuba O -
Czech Republic P 2021-04-08 A N -
Democratic People's Republic of Korea - 2021-03-28 Y Y N -
Denmark P 2021-03-30 Y Y N -
Finland P 2021-03-29 A Y N -
France P 2021-04-07 Y Y N -
Germany P 2021-03-25 A Y N -
Ghana O -
Greece O 2021-04-09 A N -
Hungary O -
Iceland O -
India P 2021-04-08 A Y N -
Indonesia O -
Ireland P 2021-03-19 Y Y N -
Israel P 2021-04-01 Y Y N -
Italy P 2021-03-29 A N -
Japan P 2021-03-26 Y Y Y -
Kazakhstan P -
Kenya O 2021-04-08 Y Y N -
Korea, Republic of P 2021-04-09 Y Y Y -
Lebanon P -
Malaysia O -
Mexico P 2021-04-08 Y Y N -
Netherlands P 2021-03-29 A N -
New Zealand O -
Norway P 2021-03-01 A Y N -
Pakistan O -
Philippines, Rep. of the O -
Poland P 2021-04-09 Y Y N -
Portugal - 2021-04-08 A Y N -
Romania O -
Russian Federation P 2021-04-09 Y Y N -
Serbia O -
Singapore P 2021-04-05 A Y N -
Spain P 2021-04-05 A N -
Sweden P 2021-02-08 A Y N -
Switzerland P 2021-03-26 A N -
Turkey O -
Ukraine O -
United Arab Emirates - 2021-04-08 Y Y N -
United Kingdom P 2021-03-19 A N -
United States of America P 2021-03-04 Y Y Y -

NOTES:


The final result of voting will be indicated in the Report of Voting (RVN), as P-members have the possibility to nominate an expert within four weeks after the closing date.



  • 1. Vote: Does the National Committee approve the addition of the new proposal to the program of work of the committee?
    Y = In favour; N = Against; A = Abstention.

  • 2. Abstentions are not taken into account when totalizing the votes.

  • 3. Only votes received from P-members before the closing date are counted in determining the decision.

  • 4. If approved, should the next stage be a Committee Draft or a Committee Draft for Vote?

  • 5. Is the National Committee prepared to participate in the development of the project? [Y/N]
    Note: Only the participation of those voting in favour of the proposal are taken into account.


P-members not voting: Kazakhstan; Lebanon(2)


*Comments not included in the compiled table, available as a separate file, because they were not submitted using the template Form-Comments.