International Standards and Conformity Assessment for all electrical, electronic and related technologies

SyC LVDC

Low Voltage Direct Current and Low Voltage Direct Current for Electricity Access

 

Approval

P-Members

Voting
P-Members

Approving
Approval %
Criteria
Result
11 11 100 >=66.7% APPROVED

Participation

Number of

P-Members
P-Members

approving and

participating
Criteria
Result
22 5 >=4 (if <=16)
>=5 (if >=17)
APPROVED

 Illustration: Voting

Voting Result

APPROVED

Document SyCLVDC/77/NP

 

Project : IEC 63318 ED1

PNW SYCLVDC-77: ELECTRICITY ACCESS REQUIREMENTS WITH SELV DC FOR TIER II AND TIER III OF ESMAP MULTI-TIER FRAMEWORK FOR HOUSE HOLD ELECTRICITY SUPPLY

 

Reference Circulation date Closing date Downloads
SyCLVDC/77/NP 2020-01-17 2020-04-10
Compilation of Comments
CC file    
 
export to xls file

Result of Voting

Country
Status
Received
Approving
CD
CDV
Participation
Comments
Australia O -
Austria P 2020-04-06 A Y N -
Belgium P 2020-04-10 A N -
Brazil O 2020-04-10 Y Y N -
Canada P 2020-04-09 Y Y Y -
China P 2020-03-30 Y Y N -
Czech Republic O -
Côte D'Ivoire P 2020-01-26 A Y N -
Denmark P 2020-04-08 Y Y N -
Finland P 2020-03-10 A Y N -
France P 2020-04-09 Y Y N -
Germany P 2020-02-03 Y Y N -
Greece - 2020-04-07 A Y N -
India P 2020-03-18 Y Y Y Y
Italy P 2020-04-08 Y Y Y Y
Japan P 2020-04-10 A N Y
Kenya P -
Korea, Republic of P 2020-04-10 Y Y N -
Netherlands P 2020-04-09 Y Y Y -
Norway O -
Peru P 2020-04-09 A Y N -
Poland O -
Portugal - 2020-04-09 A N -
Qatar - 2020-04-08 Y Y N -
Romania P -
Russian Federation P 2020-04-08 Y Y N Y
South Africa O -
Spain P 2020-04-07 Y Y Y -
Sweden O -
Switzerland P 2020-03-20 A Y N -
Ukraine O -
United Arab Emirates - 2020-04-09 A N -
United Kingdom P 2020-04-06 A N -
United States of America P 2020-04-10 A N -

NOTES:


The final result of voting will be indicated in the Report of Voting (RVN), as P-members have the possibility to nominate an expert within four weeks after the closing date.



  • 1. Vote: Does the National Committee approve the addition of the new proposal to the program of work of the committee?
    Y = In favour; N = Against; A = Abstention.

  • 2. Abstentions are not taken into account when totalizing the votes.

  • 3. Only votes received from P-members before the closing date are counted in determining the decision.

  • 4. If approved, should the next stage be a Committee Draft or a Committee Draft for Vote?

  • 5. Is the National Committee prepared to participate in the development of the project? [Y/N]
    Note: Only the participation of those voting in favour of the proposal are taken into account.


P-members not voting: Kenya; Romania(2)


*Comments not included in the compiled table, available as a separate file, because they were not submitted using the template Form-Comments.