SC 17C

Assemblies

 

Approval

P-Members

Voting
P-Members

Approving
Approval %
Criteria
Result
17 17 100 >=66.7% APPROVED

Participation

Number of

P-Members
P-Members

approving and

participating
Criteria
Result
28 3 >=4 (if <=16)
>=5 (if >=17)
REJECTED

 Illustration: Voting

Voting Result

REJECTED

Document 17C/734/NP

 

Project : PNW TS 17C-734

PNW TS 17C-734: High-voltage switchgear and control gear - Part 317: Mobile substation using air and gas-Insulated switchgear assemblies  

 

Reference Circulation date Closing date Downloads
17C/734/NP 2019-12-06 2020-02-28
Compilation of Comments
CC file    
 
export to xls file

Result of Voting

Country
Status
Received
Approving
CD
CDV
Participation
Comments
Australia P 2020-02-27 A Y N -
Austria P 2020-02-27 Y Y N Y
Belarus O 2020-02-28 Y Y N -
Belgium P 2020-02-28 A N -
Brazil P 2020-02-28 Y Y N -
Bulgaria O -
Canada P 2020-02-07 Y Y N -
China P 2020-02-17 Y Y Y -
Colombia O 2020-02-28 Y Y N -
Croatia O -
Czech Republic P 2020-02-26 Y Y N -
Denmark P 2020-02-27 A N -
Egypt O 2019-12-23 Y Y N -
Finland O -
France P 2020-02-28 Y Y N Y
Germany P 2020-01-28 Y Y Y Y
Greece O 2020-02-27 A N -
Hungary O -
India P 2020-02-27 Y Y N -
Indonesia P 2020-02-24 A N -
Iran P 2020-02-26 A N -
Ireland O -
Israel O -
Italy P 2020-02-26 Y Y N -
Japan P 2020-02-21 Y Y Y Y
Korea, Republic of P 2020-02-28 Y Y N -
Malaysia P 2020-01-31 Y Y N -
Netherlands P 2020-02-18 A N -
New Zealand O -
Norway P 2020-02-28 Y Y N -
Oman O -
Pakistan - 2020-02-24 Y Y N -
Philippines, Rep. of the O -
Poland O -
Portugal O 2020-02-28 A N -
Qatar - 2020-02-26 Y Y N -
Romania O 2020-02-28 Y Y N -
Russian Federation P 2020-02-27 Y Y N -
Serbia O -
Singapore O -
Slovakia O -
Slovenia O 2019-12-20 Y Y N -
South Africa P 2020-02-28 Y Y N Y
Spain P 2020-02-28 Y Y N -
Sweden P 2020-02-27 A N -
Switzerland P 2020-02-11 A N Y
Thailand O -
Turkey P 2020-02-26 A N -
Ukraine P 2020-01-13 Y Y N -
United Arab Emirates - 2020-02-24 A N -
United Kingdom P 2020-02-13 A Y N Y
United States of America P 2020-02-24 A Y N -

NOTES:


The final result of voting will be indicated in the Report of Voting (RVN), as P-members have the possibility to nominate an expert within four weeks after the closing date.



  • 1. Vote: Does the National Committee approve the addition of the new proposal to the program of work of the committee?
    Y = In favour; N = Against; A = Abstention.

  • 2. Abstentions are not taken into account when totalizing the votes.

  • 3. Only votes received from P-members before the closing date are counted in determining the decision.

  • 4. If approved, should the next stage be a Committee Draft or a Committee Draft for Vote?

  • 5. Is the National Committee prepared to participate in the development of the project? [Y/N]
    Note: Only the participation of those voting in favour of the proposal are taken into account.


P-members not voting: (0)


*Comments not included in the compiled table, available as a separate file, because they were not submitted using the template Form-Comments.