International Standards and Conformity Assessment for all electrical, electronic and related technologies

SC 86B

Fibre optic interconnecting devices and passive components

 

Approval

P-Members

Voting
P-Members

Approving
Approval %
Criteria
Result
14 14 100 >=66.7% APPROVED

Participation

Number of

P-Members
P-Members

approving and

participating
Criteria
Result
23 6 >=4 (if <=16)
>=5 (if >=17)
APPROVED

 Illustration: Voting

Voting Result

APPROVED

Document 86B/4313/NP

 

Project : IEC 61753-081-03 ED1

PNW 86B-4313:

Fibre optic interconnecting devices and passive components – Performance standard - Part 081-03: Non-connectorized single-mode fibre optic middle-scale 1 x N DWDM devices for category OP – Outdoor protected environment

 

Reference Circulation date Closing date Downloads
86B/4313/NP 2020-06-12 2020-09-04
Compilation of Comments
CC file    
 
export to xls file

Result of Voting

Country
Status
Received
Approving
CD
CDV
Participation
Comments
Australia O -
Austria P 2020-09-03 A Y N -
Belarus - 2020-09-01 Y Y N -
Belgium P 2020-09-03 Y Y N -
Brazil O 2020-09-04 A N -
Bulgaria O -
Canada P 2020-09-03 Y Y N -
China P 2020-08-24 Y Y Y -
Czech Republic P 2020-09-03 Y Y N -
Denmark O -
Finland P 2020-08-27 Y Y N -
France P 2020-09-03 A Y N Y
Germany P 2020-08-18 Y Y Y -
Greece O 2020-09-04 Y Y N -
Hungary O -
India P 2020-09-04 A N -
Indonesia O -
Iran O 2020-09-03 A Y N -
Ireland O -
Israel P 2020-09-02 A N -
Italy P 2020-09-04 Y Y Y -
Japan P 2020-08-13 Y Y Y Y
Korea, Republic of P 2020-09-04 Y Y N -
Malaysia O -
Mexico P 2020-09-04 Y Y N -
Netherlands P 2020-08-28 A Y N -
New Zealand O -
Norway O 2020-09-01 A Y N -
Pakistan P 2020-09-01 Y Y N -
Poland P 2020-09-03 Y Y Y -
Portugal P 2020-09-04 A Y N -
Romania O -
Russian Federation O 2020-09-03 Y Y N -
Saudi Arabia O -
Serbia O -
Slovakia P 2020-08-11 Y Y N -
South Africa O -
Spain O -
Sweden P 2020-08-31 A Y N -
Switzerland P 2020-09-02 A N -
Thailand O -
Turkey O -
Ukraine O -
United Arab Emirates - 2020-09-01 Y Y N -
United Kingdom P 2020-08-11 A N -
United States of America P 2020-09-03 Y Y Y Y

NOTES:


The final result of voting will be indicated in the Report of Voting (RVN), as P-members have the possibility to nominate an expert within four weeks after the closing date.



  • 1. Vote: Does the National Committee approve the addition of the new proposal to the program of work of the committee?
    Y = In favour; N = Against; A = Abstention.

  • 2. Abstentions are not taken into account when totalizing the votes.

  • 3. Only votes received from P-members before the closing date are counted in determining the decision.

  • 4. If approved, should the next stage be a Committee Draft or a Committee Draft for Vote?

  • 5. Is the National Committee prepared to participate in the development of the project? [Y/N]
    Note: Only the participation of those voting in favour of the proposal are taken into account.


P-members not voting: (0)


*Comments not included in the compiled table, available as a separate file, because they were not submitted using the template Form-Comments.