International Standards and Conformity Assessment for all electrical, electronic and related technologies

SC 86B

Fibre optic interconnecting devices and passive components

 

Approval

P-Members

Voting
P-Members

Approving
Approval %
Criteria
Result
15 15 100 >=66.7% APPROVED

Participation

Number of

P-Members
P-Members

approving and

participating
Criteria
Result
23 5 >=4 (if <=16)
>=5 (if >=17)
APPROVED

 Illustration: Voting

Voting Result

APPROVED

Document 86B/4278/NP

 

Project : IEC 61753-022-13 ED1

PNW 86B-4278: ibre optic interconnecting devices and passive components – Performance standard – Part 022-XX: Fibre optic connectors terminated on multimode fibre for category OP+ HD – Extended outdoor protected environment with additional heat 

 

Reference Circulation date Closing date Downloads
86B/4278/NP 2020-02-28 2020-05-22
Compilation of Comments
CC file    
 
export to xls file

Result of Voting

Country
Status
Received
Approving
CD
CDV
Participation
Comments
Australia O -
Austria P 2020-05-20 A Y N -
Belgium P 2020-05-20 Y Y Y Y
Brazil O 2020-05-22 A N -
Bulgaria O -
Canada P 2020-05-12 Y Y Y -
China P 2020-05-11 Y Y Y Y
Czech Republic P 2020-05-20 Y Y N -
Côte D'Ivoire - 2020-04-10 A N -
Denmark O 2020-05-19 A Y N -
Finland P 2020-05-18 Y Y N -
France P 2020-04-08 Y Y N Y
Germany P 2020-05-07 Y Y Y -
Greece O 2020-05-22 Y Y N -
Hungary O -
India P 2020-05-22 A Y N -
Indonesia O -
Iran O 2020-05-21 A Y N -
Ireland O -
Israel P 2020-05-21 A N -
Italy P 2020-05-22 Y Y N -
Japan P 2020-05-13 A Y N Y
Korea, Republic of P 2020-05-22 Y Y N -
Malaysia O -
Mexico P 2020-05-20 Y Y N -
Netherlands P 2020-05-11 A N -
New Zealand O -
Norway O 2020-05-20 A Y N -
Pakistan P -
Poland P 2020-05-19 Y Y N -
Portugal P 2020-05-22 A N -
Romania O -
Russian Federation O 2020-05-22 Y Y N -
Saudi Arabia O -
Serbia O -
Slovakia P 2020-04-27 Y Y N -
South Africa O -
Spain O -
Sweden P 2020-05-07 Y Y N -
Switzerland P 2020-05-15 Y Y N Y
Thailand O -
Turkey O -
Ukraine O -
United Arab Emirates - 2020-05-17 Y Y N -
United Kingdom P 2020-05-04 A Y N -
United States of America P 2020-05-21 Y Y Y Y

NOTES:


The final result of voting will be indicated in the Report of Voting (RVN), as P-members have the possibility to nominate an expert within four weeks after the closing date.



  • 1. Vote: Does the National Committee approve the addition of the new proposal to the program of work of the committee?
    Y = In favour; N = Against; A = Abstention.

  • 2. Abstentions are not taken into account when totalizing the votes.

  • 3. Only votes received from P-members before the closing date are counted in determining the decision.

  • 4. If approved, should the next stage be a Committee Draft or a Committee Draft for Vote?

  • 5. Is the National Committee prepared to participate in the development of the project? [Y/N]
    Note: Only the participation of those voting in favour of the proposal are taken into account.


P-members not voting: Pakistan(1)


*Comments not included in the compiled table, available as a separate file, because they were not submitted using the template Form-Comments.