SC 48B

Electrical connectors

 

Approval

P-Members

Voting
P-Members

Approving
Approval %
Criteria
Result
11 8 72.7 >=66.7% APPROVED

Participation

Number of

P-Members
P-Members

approving and

participating
Criteria
Result
18 4 >=4 (if <=16)
>=5 (if >=17)
REJECTED

 Illustration: Voting

Voting Result

REJECTED

Document 48B/2838A/NP

 

Project : PNW 48B-2838

PNW 48B-2838: CONNECTORS FOR ELECTRONIC EQUIPMENT PRODUCT REQUIREMENTS Part 8-10X: Power connectors – Detail specification for 3-pole snap locking waterproof rectangular connectors with plastic housing for rated current of 20 A

 

Reference Circulation date Closing date Downloads
48B/2838A/NP 2020-09-18 2020-12-11
Compilation of Comments
CC file    
 
export to xls file

Result of Voting

Country
Status
Received
Approving
CD
CDV
Participation
Comments
Austria P 2020-12-09 A Y N -
Belgium P 2020-12-10 A N -
Brazil O 2020-12-11 N N Y
Bulgaria O -
China P 2020-11-30 Y Y Y -
Czech Republic P 2020-12-11 Y Y N -
Denmark P 2020-12-10 Y Y N -
Finland P 2020-12-10 A Y N -
France P 2020-12-01 A N -
Germany P 2020-12-02 N N Y
Greece - 2020-12-10 Y Y N -
Hungary O -
India O -
Iran O -
Ireland P 2020-10-27 Y Y N -
Israel O -
Italy P 2020-12-01 Y Y Y Y
Japan P 2020-12-09 Y Y Y Y
Netherlands P 2020-12-10 Y Y Y -
Norway O -
Pakistan P -
Poland O -
Portugal - 2020-12-11 A Y N -
Romania O -
Russian Federation P 2020-12-09 Y Y N -
Serbia O -
Spain P 2020-12-10 N N Y
Sweden O -
Switzerland P 2020-10-20 N Y N Y
Ukraine O -
United Kingdom P 2020-11-17 A Y N -
United States of America P 2020-11-23 A N -

NOTES:


The final result of voting will be indicated in the Report of Voting (RVN), as P-members have the possibility to nominate an expert within four weeks after the closing date.



  • 1. Vote: Does the National Committee approve the addition of the new proposal to the program of work of the committee?
    Y = In favour; N = Against; A = Abstention.

  • 2. Abstentions are not taken into account when totalizing the votes.

  • 3. Only votes received from P-members before the closing date are counted in determining the decision.

  • 4. If approved, should the next stage be a Committee Draft or a Committee Draft for Vote?

  • 5. Is the National Committee prepared to participate in the development of the project? [Y/N]
    Note: Only the participation of those voting in favour of the proposal are taken into account.


P-members not voting: Pakistan(1)


*Comments not included in the compiled table, available as a separate file, because they were not submitted using the template Form-Comments.