SC 48B

Electrical connectors

 

Approval

P-Members

Voting
P-Members

Approving
Approval %
Criteria
Result
12 10 83.3 >=66.7% APPROVED

Participation

Number of

P-Members
P-Members

approving and

participating
Criteria
Result
18 5 >=4 (if <=16)
>=5 (if >=17)
APPROVED

 Illustration: Voting

Voting Result

APPROVED

Document 48B/2837/NP

 

Project : IEC 61076-8-105 ED1

PNW 48B-2837: CONNECTORS FOR ELECTRONIC EQUIPMENT PRODUCT REQUIREMENTS Part 8-10X: Power connectors – Detail specification for 2-pole snap locking power rectangular connectors with plastic housing for rated current of 63 A

 

Reference Circulation date Closing date Downloads
48B/2837/NP 2020-07-24 2020-10-16
Compilation of Comments
CC file    
 
export to xls file

Result of Voting

Country
Status
Received
Approving
CD
CDV
Participation
Comments
Austria P 2020-10-14 A Y N -
Belgium P 2020-10-15 A N -
Brazil O 2020-10-09 N N Y
Bulgaria O -
China P 2020-10-09 Y Y Y Y
Czech Republic P 2020-10-14 Y Y N -
Denmark P 2020-10-14 Y Y N -
Finland P 2020-10-13 A Y N -
France P 2020-09-03 A N -
Germany P 2020-10-15 N N Y
Greece - 2020-10-16 Y Y N -
Hungary O -
India O -
Iran O 2020-10-16 A Y N -
Ireland P 2020-07-31 Y Y N -
Israel O -
Italy P 2020-10-08 Y Y Y Y
Japan P 2020-10-16 Y Y Y Y
Netherlands P 2020-10-12 Y Y Y -
Norway O -
Pakistan P -
Poland O -
Portugal - 2020-10-16 A Y N -
Romania O -
Russian Federation P 2020-10-16 Y Y N -
Serbia O -
Spain P 2020-10-14 N Y N Y
Sweden O -
Switzerland P 2020-09-24 A Y N -
Ukraine O -
United Arab Emirates - 2020-10-15 Y Y N -
United Kingdom P 2020-09-23 Y Y Y -
United States of America P 2020-09-16 Y Y N -

NOTES:


The final result of voting will be indicated in the Report of Voting (RVN), as P-members have the possibility to nominate an expert within four weeks after the closing date.



  • 1. Vote: Does the National Committee approve the addition of the new proposal to the program of work of the committee?
    Y = In favour; N = Against; A = Abstention.

  • 2. Abstentions are not taken into account when totalizing the votes.

  • 3. Only votes received from P-members before the closing date are counted in determining the decision.

  • 4. If approved, should the next stage be a Committee Draft or a Committee Draft for Vote?

  • 5. Is the National Committee prepared to participate in the development of the project? [Y/N]
    Note: Only the participation of those voting in favour of the proposal are taken into account.


P-members not voting: Pakistan(1)


*Comments not included in the compiled table, available as a separate file, because they were not submitted using the template Form-Comments.