SC 48B

Electrical connectors

 

Approval

P-Members

Voting
P-Members

Approving
Approval %
Criteria
Result
11 9 81.8 >=66.7% APPROVED

Participation

Number of

P-Members
P-Members

approving and

participating
Criteria
Result
18 5 >=4 (if <=16)
>=5 (if >=17)
APPROVED

 Illustration: Voting

Voting Result

APPROVED

Document 48B/2835/NP

 

Project : IEC 61076-8-108 ED1

PNW 48B-2835: CONNECTORS FOR ELECTRONIC EQUIPMENT–PRODUCT REQUIREMENTS–Part 61076–8–XXX: Power connectors–Detail specification for 2P power plus 2P signal plastic housing rectangular shielded connectors with 250A rated current and IP68/IPXXB degree of protection

 

Reference Circulation date Closing date Downloads
48B/2835/NP 2020-07-17 2020-10-09
Compilation of Comments
CC file    
 
export to xls file

Result of Voting

Country
Status
Received
Approving
CD
CDV
Participation
Comments
Austria P 2020-10-07 A Y N -
Belgium P 2020-10-09 A N -
Brazil O 2020-10-09 N N Y
Bulgaria O -
China P 2020-09-29 Y Y Y Y
Czech Republic P 2020-10-09 Y Y N -
Denmark P 2020-10-08 Y Y N -
Finland P 2020-10-06 A N -
France P 2020-09-03 A N -
Germany P 2020-10-08 N N Y
Greece - 2020-10-09 Y Y N -
Hungary O -
India O -
Ireland P 2020-07-31 Y Y N -
Israel O -
Italy P 2020-10-08 Y Y Y Y
Japan P 2020-10-07 Y Y Y Y
Netherlands P 2020-10-08 Y Y Y -
Norway O -
Pakistan P -
Poland O -
Portugal - 2020-10-09 A Y N -
Romania O -
Russian Federation P 2020-10-09 Y Y N -
Serbia O -
Spain P 2020-10-06 N Y N Y
Sweden O -
Switzerland P 2020-09-24 A Y N -
Ukraine O -
United Kingdom P 2020-09-15 Y Y Y -
United States of America P 2020-10-02 A N -

NOTES:


The final result of voting will be indicated in the Report of Voting (RVN), as P-members have the possibility to nominate an expert within four weeks after the closing date.



  • 1. Vote: Does the National Committee approve the addition of the new proposal to the program of work of the committee?
    Y = In favour; N = Against; A = Abstention.

  • 2. Abstentions are not taken into account when totalizing the votes.

  • 3. Only votes received from P-members before the closing date are counted in determining the decision.

  • 4. If approved, should the next stage be a Committee Draft or a Committee Draft for Vote?

  • 5. Is the National Committee prepared to participate in the development of the project? [Y/N]
    Note: Only the participation of those voting in favour of the proposal are taken into account.


P-members not voting: Pakistan(1)


*Comments not included in the compiled table, available as a separate file, because they were not submitted using the template Form-Comments.