SC 47D

Semiconductor devices packaging

 

Approval

P-Members

Voting
P-Members

Approving
Approval %
Criteria
Result
6 5 83.3 >=66.7% APPROVED

Participation

Number of

P-Members
P-Members

approving and

participating
Criteria
Result
9 2 >=4 (if <=16)
>=5 (if >=17)
REJECTED

 Illustration: Voting

Voting Result

Document 47D/927/NP

 

Project : PNW 47D-927 ED1

PNW 47D-927 ED1: Future 63xxx-3 Ed.1: Thermal standardization on semiconductor packaging – Part 3: Thermal circuit simulation models of semiconductor packages for transient analysis

 

Reference Circulation date Closing date Downloads
47D/927/NP 2021-01-22 2021-04-16
Compilation of Comments
CC file    
 
export to xls file

Result of Voting

Country
Status
Received
Approving
CD
CDV
Participation
Comments
Austria P 2021-04-15 A Y N -
Belarus O 2021-04-12 Y Y N -
Belgium P 2021-04-16 A N -
China P 2021-04-06 Y Y N Y
Czech Republic O -
Democratic People's Republic of Korea - 2021-04-11 Y Y N -
Denmark O -
Finland O 2021-01-25 A N -
France O 2021-04-14 A Y N -
Germany P 2021-04-16 N Y Y Y
Greece - 2021-04-16 A N -
Iran O 2021-04-14 A Y N -
Italy O 2021-04-15 Y Y N -
Japan P 2021-04-12 Y Y Y Y
Korea, Republic of P 2021-04-16 Y Y N -
Netherlands O 2021-04-16 A N -
Pakistan P 2021-04-14 A Y N -
Poland O -
Portugal O 2021-04-16 A Y N -
Romania O -
Russian Federation O 2021-04-16 A Y N -
Singapore P 2021-03-17 Y Y N -
Spain O -
Sweden O -
Switzerland O 2021-01-29 A N -
Thailand O -
Ukraine O -
United Arab Emirates - 2021-04-12 Y Y N -
United Kingdom O 2021-03-22 A Y N -
United States of America P 2021-03-12 Y Y Y -

NOTES:


The final result of voting will be indicated in the Report of Voting (RVN), as P-members have the possibility to nominate an expert within four weeks after the closing date.



  • 1. Vote: Does the National Committee approve the addition of the new proposal to the program of work of the committee?
    Y = In favour; N = Against; A = Abstention.

  • 2. Abstentions are not taken into account when totalizing the votes.

  • 3. Only votes received from P-members before the closing date are counted in determining the decision.

  • 4. If approved, should the next stage be a Committee Draft or a Committee Draft for Vote?

  • 5. Is the National Committee prepared to participate in the development of the project? [Y/N]
    Note: Only the participation of those voting in favour of the proposal are taken into account.


P-members not voting: (0)


*Comments not included in the compiled table, available as a separate file, because they were not submitted using the template Form-Comments.