SC 46A

Coaxial cables

 

Approval

P-Members

Voting
P-Members

Approving
Approval %
Criteria
Result
7 7 100 >=66.7% APPROVED

Participation

Number of

P-Members
P-Members

approving and

participating
Criteria
Result
12 4 >=4 (if <=16)
>=5 (if >=17)
APPROVED

 Illustration: Voting

Voting Result

APPROVED

Document 46A/1426/NP

 

Project : IEC 61196-9-2 ED1

PNW 46A-1426: Coaxial communication cables - Part 9-2: Detail specification for 50-0,4 type RF flexible cables

 

Reference Circulation date Closing date Downloads
46A/1426/NP 2020-07-17 2020-10-09
Compilation of Comments
CC file    
 
export to xls file

Result of Voting

Country
Status
Received
Approving
CD
CDV
Participation
Comments
Austria O 2020-10-07 A Y N -
Belgium O 2020-10-08 A N -
Bulgaria O -
China P 2020-09-29 Y Y Y Y
Czech Republic O -
Denmark P 2020-10-08 Y Y N -
Finland P 2020-10-09 A Y N -
France P 2020-10-08 A Y N -
Germany P 2020-10-08 Y Y Y -
Greece O 2020-10-09 A N -
Hungary O -
India O -
Iran O 2020-10-07 A Y N -
Ireland O -
Israel O -
Italy P 2020-10-06 Y Y Y -
Japan P 2020-09-17 A N -
Kazakhstan - 2020-10-09 Y Y N -
Korea, Republic of O -
Mexico O -
Netherlands O 2020-09-20 A Y N -
New Zealand O -
Norway O 2020-10-08 A Y N -
Poland O -
Portugal - 2020-10-09 A Y N -
Romania O -
Russian Federation P 2020-10-09 Y Y N -
Serbia O -
Slovakia O -
Spain P 2020-10-05 A N -
Sweden O -
Switzerland P 2020-09-25 Y Y N Y
Turkey O -
Ukraine O -
United Kingdom P 2020-09-15 A Y N -
United States of America P 2020-10-09 Y Y Y -

NOTES:


The final result of voting will be indicated in the Report of Voting (RVN), as P-members have the possibility to nominate an expert within four weeks after the closing date.



  • 1. Vote: Does the National Committee approve the addition of the new proposal to the program of work of the committee?
    Y = In favour; N = Against; A = Abstention.

  • 2. Abstentions are not taken into account when totalizing the votes.

  • 3. Only votes received from P-members before the closing date are counted in determining the decision.

  • 4. If approved, should the next stage be a Committee Draft or a Committee Draft for Vote?

  • 5. Is the National Committee prepared to participate in the development of the project? [Y/N]
    Note: Only the participation of those voting in favour of the proposal are taken into account.


P-members not voting: (0)


*Comments not included in the compiled table, available as a separate file, because they were not submitted using the template Form-Comments.