International Standards and Conformity Assessment for all electrical, electronic and related technologies

TC 113

Nanotechnology for electrotechnical products and systems

 

Approval

P-Members

Voting
P-Members

Approving
Approval %
Criteria
Result
11 10 90.9 >=66.7% APPROVED

Participation

Number of

P-Members
P-Members

approving and

participating
Criteria
Result
16 4 >=4 (if <=16)
>=5 (if >=17)
APPROVED

 Illustration: Voting

Voting Result

APPROVED

Document 113/520/NP

 

Project : IEC TS 62607-8-3 ED1

PNW TS 113-520: Nanomanufacturing - Key Control Characteristics - Part 8-3: Nano-enabled metal-oxide interfacial devices – Test method for the analogue change and resistance fluctuation

 

Reference Circulation date Closing date Downloads
113/520/NP 2019-12-06 2020-02-28
Compilation of Comments
CC file    
 
export to xls file

Result of Voting

Country
Status
Received
Approving
CD
CDV
Participation
Comments
Argentina O -
Australia P 2020-01-30 A N -
Austria O -
Belarus O 2020-02-28 Y Y N -
Belgium O 2020-02-28 A N -
Brazil O 2020-02-28 A N -
Bulgaria P 2020-01-02 Y Y N -
Canada P 2020-02-26 Y Y N Y
China P 2020-02-17 Y Y Y Y
Czech Republic O -
Denmark O -
Finland P 2020-02-24 A Y N -
France O 2020-02-20 A N -
Germany P 2020-02-24 Y Y Y -
Greece - 2020-02-27 A N -
Hungary O -
India O -
Indonesia O -
Iran P 2020-02-26 A Y N -
Italy P 2020-02-27 Y Y Y -
Japan P 2020-02-20 Y Y Y -
Korea, Republic of P 2020-01-20 Y Y N -
Malaysia P 2020-01-31 Y Y N -
Mexico O 2020-02-28 Y Y N -
Netherlands O -
Norway P 2020-02-28 A N -
Poland O -
Portugal O 2020-02-28 A N -
Qatar - 2020-02-26 A Y N -
Romania O -
Russian Federation P 2020-02-27 Y Y N -
Singapore O -
South Africa O -
Spain P 2020-02-27 A N -
Sweden O 2020-02-28 A Y N -
United Arab Emirates - 2020-02-24 A N -
United Kingdom P 2020-01-31 N Y N Y
United States of America P 2020-02-18 Y Y N -

NOTES:


The final result of voting will be indicated in the Report of Voting (RVN), as P-members have the possibility to nominate an expert within four weeks after the closing date.



  • 1. Vote: Does the National Committee approve the addition of the new proposal to the program of work of the committee?
    Y = In favour; N = Against; A = Abstention.

  • 2. Abstentions are not taken into account when totalizing the votes.

  • 3. Only votes received from P-members before the closing date are counted in determining the decision.

  • 4. If approved, should the next stage be a Committee Draft or a Committee Draft for Vote?

  • 5. Is the National Committee prepared to participate in the development of the project? [Y/N]
    Note: Only the participation of those voting in favour of the proposal are taken into account.


P-members not voting: (0)


*Comments not included in the compiled table, available as a separate file, because they were not submitted using the template Form-Comments.