TC 111

Environmental standardization for electrical and electronic products and systems

 

Approval

P-Members

Voting
P-Members

Approving
Approval %
Criteria
Result
19 19 100 >=66.7% APPROVED

Participation

Number of

P-Members
P-Members

approving and

participating
Criteria
Result
26 7 >=4 (if <=16)
>=5 (if >=17)
APPROVED

 Illustration: Voting

Voting Result

APPROVED

Document 111/611/NP

 

Project : PNW TS 111-611 ED1

PNW TS 111-611 ED1: Material declaration for products of and for the electrotechnical industry: Guidance for the implementation of IEC 62474.

 

Reference Circulation date Closing date Downloads
111/611/NP 2021-01-15 2021-03-12
Compilation of Comments
CC file    
 
export to xls file

Result of Voting

Country
Status
Received
Approving
CD
CDV
Participation
Comments
Austria O 2021-03-10 A Y N -
Belarus O 2021-03-09 Y Y N -
Belgium P 2021-03-12 Y Y N -
Brazil P 2021-03-12 A N -
Canada P 2021-03-08 Y Y Y -
China P 2021-03-01 Y Y Y Y
Czech Republic P 2021-03-11 Y Y N -
Democratic People's Republic of Korea - 2021-03-08 Y Y N -
Denmark P 2021-03-10 Y Y N -
Egypt P 2021-03-11 Y Y N Y
Finland P 2021-03-10 Y Y Y -
France P 2021-03-10 Y Y Y -
Germany P 2021-03-11 Y Y Y Y
Greece - 2021-03-12 A N -
India P 2021-01-28 A Y N -
Ireland P 2021-03-11 Y Y N -
Israel O -
Italy P 2021-03-11 Y Y N -
Japan P 2021-02-24 Y Y Y -
Korea, Republic of P 2021-03-11 Y Y N -
Malaysia P 2021-02-05 Y Y N -
Mexico P 2021-03-11 Y Y N -
Netherlands P 2021-03-11 A Y N -
Norway P 2021-03-12 A N -
Pakistan O -
Poland O 2021-03-11 Y Y N -
Portugal - 2021-03-12 A Y N -
Romania O -
Russian Federation P 2021-02-26 Y Y N -
Slovakia O -
Slovenia O -
South Africa O -
Spain P 2021-03-10 A Y N -
Sweden P 2021-03-08 Y Y N -
Switzerland P 2021-03-11 A Y N -
Thailand P 2021-03-11 Y Y N -
United Arab Emirates - 2021-03-10 Y Y N -
United Kingdom P 2021-03-12 A Y N -
United States of America P 2021-03-12 Y Y Y -

NOTES:


The final result of voting will be indicated in the Report of Voting (RVN), as P-members have the possibility to nominate an expert within four weeks after the closing date.



  • 1. Vote: Does the National Committee approve the addition of the new proposal to the program of work of the committee?
    Y = In favour; N = Against; A = Abstention.

  • 2. Abstentions are not taken into account when totalizing the votes.

  • 3. Only votes received from P-members before the closing date are counted in determining the decision.

  • 4. If approved, should the next stage be a Committee Draft or a Committee Draft for Vote?

  • 5. Is the National Committee prepared to participate in the development of the project? [Y/N]
    Note: Only the participation of those voting in favour of the proposal are taken into account.


P-members not voting: (0)


*Comments not included in the compiled table, available as a separate file, because they were not submitted using the template Form-Comments.