International Standards and Conformity Assessment for all electrical, electronic and related technologies

TC 110

Electronic displays

 

Approval

P-Members

Voting
P-Members

Approving
Approval %
Criteria
Result
10 9 90 >=66.7% APPROVED

Participation

Number of

P-Members
P-Members

approving and

participating
Criteria
Result
24 3 >=4 (if <=16)
>=5 (if >=17)
REJECTED

 Illustration: Voting

Voting Result

REJECTED

Document 110/1181/NP

 

Project : PNW 110-1181

PNW 110-1181: Future IEC 62715-6-4: Flexible display devices – Part 6-4: Environmental and mechanical test methods

 

Reference Circulation date Closing date Downloads
110/1181/NP 2020-01-24 2020-03-20
Compilation of Comments
CC file    
 
export to xls file

Result of Voting

Country
Status
Received
Approving
CD
CDV
Participation
Comments
Australia O -
Austria O 2020-03-20 A Y N -
Belarus O 2020-03-20 Y Y N -
Belgium P 2020-03-20 A N -
Brazil P 2020-03-20 A N -
Canada P 2020-03-12 A Y N -
China P 2020-03-09 Y Y Y -
Czech Republic O -
Denmark P 2020-03-19 A Y N -
Finland P 2020-03-20 Y Y N -
France P 2020-03-12 A Y N -
Germany P 2020-03-13 Y Y N -
Greece - 2020-03-20 A N -
Hungary P 2020-02-07 A Y N -
India P 2020-03-18 A Y N -
Iran O -
Ireland O -
Italy P 2020-03-19 A N -
Japan P 2020-03-11 Y Y Y Y
Korea, Republic of P 2020-03-20 Y Y Y -
Malaysia O -
Mexico O -
Netherlands P 2020-03-06 A N -
New Zealand O -
Norway P 2020-03-20 A N -
Poland P 2020-03-17 Y Y N -
Portugal P 2020-03-20 A N -
Qatar - 2020-03-20 Y Y N -
Romania P 2020-03-20 Y Y N -
Russian Federation P 2020-03-20 Y Y N -
Spain P 2020-03-16 A Y N -
Sweden P 2020-03-19 A Y N -
Switzerland P 2020-03-06 A N -
Ukraine O -
United Arab Emirates - 2020-03-18 A N -
United Kingdom P 2020-02-25 Y Y N -
United States of America P 2020-03-16 N N Y

NOTES:


The final result of voting will be indicated in the Report of Voting (RVN), as P-members have the possibility to nominate an expert within four weeks after the closing date.



  • 1. Vote: Does the National Committee approve the addition of the new proposal to the program of work of the committee?
    Y = In favour; N = Against; A = Abstention.

  • 2. Abstentions are not taken into account when totalizing the votes.

  • 3. Only votes received from P-members before the closing date are counted in determining the decision.

  • 4. If approved, should the next stage be a Committee Draft or a Committee Draft for Vote?

  • 5. Is the National Committee prepared to participate in the development of the project? [Y/N]
    Note: Only the participation of those voting in favour of the proposal are taken into account.


P-members not voting: (0)


*Comments not included in the compiled table, available as a separate file, because they were not submitted using the template Form-Comments.