TC 112

Evaluation and qualification of electrical insulating materials and systems

 

Approval

P-Members

Voting
P-Members

Approving
Approval %
Criteria
Result
13 13 100 >=66.7% APPROVED

Participation

Number of

P-Members
P-Members

approving and

participating
Criteria
Result
20 6 >=4 (if <=16)
>=5 (if >=17)
APPROVED

 Illustration: Voting

Voting Result

APPROVED

Document 112/512/NP

 

Project : IEC 62631-3-12 ED1

PNW 112-512 ED1: Dielectric and resistive properties of solid insulating materials – Part 3-12 :Determination of resistive properties (DC Methods) – Volume resistance and volume resistivity, method for casting resins

 

Reference Circulation date Closing date Downloads
112/512/NP 2020-11-06 2021-01-29
Compilation of Comments
CC file    
 
export to xls file

Result of Voting

Country
Status
Received
Approving
CD
CDV
Participation
Comments
Austria P 2020-11-16 Y Y N -
Belgium O 2021-01-29 A N -
Brazil O 2021-01-29 A N -
Canada P 2021-01-25 Y Y Y Y
China P 2021-01-18 Y Y Y Y
Czech Republic P 2021-01-27 Y Y Y -
Denmark P 2021-01-28 A Y N -
Egypt P -
Finland O 2021-01-29 A Y N -
France P 2021-01-28 A Y Y Y
Germany P 2021-01-25 Y Y Y -
Greece - 2021-01-29 A N -
Hungary O -
India P 2021-01-28 Y Y N -
Iran P 2021-01-27 A Y N -
Italy P 2021-01-28 Y Y N -
Japan P 2021-01-18 Y Y N -
Korea, Republic of P 2021-01-28 Y Y N -
Netherlands P 2021-01-28 Y Y Y -
Poland O -
Portugal P 2021-01-29 A Y N -
Romania O -
Russian Federation P 2021-01-28 Y Y N -
Serbia O -
Slovakia O -
Slovenia O -
South Africa O -
Spain O 2021-01-29 A N -
Sweden P 2021-01-26 A Y N -
Switzerland P 2021-01-22 Y Y N -
Thailand O -
Ukraine O -
United Arab Emirates - 2021-01-28 Y Y N -
United Kingdom P 2021-01-12 A Y N -
United States of America P 2021-01-19 Y Y Y Y

NOTES:


The final result of voting will be indicated in the Report of Voting (RVN), as P-members have the possibility to nominate an expert within four weeks after the closing date.



  • 1. Vote: Does the National Committee approve the addition of the new proposal to the program of work of the committee?
    Y = In favour; N = Against; A = Abstention.

  • 2. Abstentions are not taken into account when totalizing the votes.

  • 3. Only votes received from P-members before the closing date are counted in determining the decision.

  • 4. If approved, should the next stage be a Committee Draft or a Committee Draft for Vote?

  • 5. Is the National Committee prepared to participate in the development of the project? [Y/N]
    Note: Only the participation of those voting in favour of the proposal are taken into account.


P-members not voting: Egypt(1)


*Comments not included in the compiled table, available as a separate file, because they were not submitted using the template Form-Comments.