TC 105

Fuel cell technologies

 

Approval

P-Members

Voting
P-Members

Approving
Approval %
Criteria
Result
15 15 100 >=66.7% APPROVED

Participation

Number of

P-Members
P-Members

approving and

participating
Criteria
Result
18 8 >=4 (if <=16)
>=5 (if >=17)
APPROVED

 Illustration: Voting

Voting Result

APPROVED

Document 105/837/NP

 

Project : IEC 62282-4-1000 ED1

PNW 105-837 ED1: Fuel cell technologies – Part 4-1000: Fuel cell power system for rolling stock– Performance requirement and test methods

 

Reference Circulation date Closing date Downloads
105/837/NP 2020-12-11 2021-02-05
Compilation of Comments
CC file    
 
export to xls file

Result of Voting

Country
Status
Received
Approving
CD
CDV
Participation
Comments
Australia P 2021-02-02 Y Y Y Y
Austria O 2021-02-03 A Y N -
Belgium O 2021-02-05 A N -
Brazil O 2021-02-04 A N -
Canada P 2021-01-25 Y Y N Y
China P 2021-01-26 Y Y Y Y
Czech Republic O -
Denmark P 2021-01-15 Y Y Y -
Egypt P 2021-02-04 Y Y N Y
Finland P 2021-02-01 A Y N -
France P 2021-02-03 Y Y Y Y
Germany P 2021-01-28 Y Y Y -
Greece - 2021-02-05 A N -
Iran O -
Israel O -
Italy P 2021-02-03 Y Y N -
Japan P 2021-02-04 Y Y Y Y
Korea, Republic of P 2020-12-14 Y Y N -
Netherlands P -
Norway O 2021-02-05 A Y N -
Poland O -
Portugal O 2021-02-05 A Y N -
Romania O 2021-02-04 Y Y N -
Russian Federation P 2021-02-04 Y Y N -
Serbia O -
South Africa P 2021-02-05 Y Y Y -
Spain P 2021-02-05 Y Y N -
Sweden O 2021-02-05 A Y N -
Switzerland P 2021-01-29 Y Y Y -
Thailand O -
Turkey O 2021-02-01 A N -
United Arab Emirates - 2021-01-31 Y Y N -
United Kingdom P 2021-02-03 A Y N Y
United States of America P 2021-01-29 Y Y N Y

NOTES:


The final result of voting will be indicated in the Report of Voting (RVN), as P-members have the possibility to nominate an expert within four weeks after the closing date.



  • 1. Vote: Does the National Committee approve the addition of the new proposal to the program of work of the committee?
    Y = In favour; N = Against; A = Abstention.

  • 2. Abstentions are not taken into account when totalizing the votes.

  • 3. Only votes received from P-members before the closing date are counted in determining the decision.

  • 4. If approved, should the next stage be a Committee Draft or a Committee Draft for Vote?

  • 5. Is the National Committee prepared to participate in the development of the project? [Y/N]
    Note: Only the participation of those voting in favour of the proposal are taken into account.


P-members not voting: Netherlands(1)


*Comments not included in the compiled table, available as a separate file, because they were not submitted using the template Form-Comments.