International Standards and Conformity Assessment for all electrical, electronic and related technologies

TC 105

Fuel cell technologies

 

Approval

P-Members

Voting
P-Members

Approving
Approval %
Criteria
Result
13 12 92.3 >=66.7% APPROVED

Participation

Number of

P-Members
P-Members

approving and

participating
Criteria
Result
19 6 >=4 (if <=16)
>=5 (if >=17)
APPROVED

 Illustration: Voting

Voting Result

APPROVED

Document 105/784/NP

 

Project : IEC 62282-4-202 ED1

PNW 105-784: Fuel Cell Technologies - Part 4-600: Fuel Cell Power Systems for unmanned aircraft systems - Performance test methods

 

Reference Circulation date Closing date Downloads
105/784/NP 2020-01-31 2020-03-27
Compilation of Comments
CC file    
 
export to xls file

Result of Voting

Country
Status
Received
Approving
CD
CDV
Participation
Comments
Australia P 2020-03-22 Y Y N -
Austria O 2020-03-27 A Y N -
Belgium O 2020-03-27 A N -
Brazil O 2020-03-27 A N -
Canada P 2020-03-04 Y Y N -
China P 2020-03-16 Y Y Y -
Colombia - 2020-03-27 Y Y N -
Czech Republic O -
Denmark P 2020-03-13 A Y N -
Egypt P 2020-03-20 Y Y N -
Finland P 2020-03-24 A Y N -
France P 2020-03-25 Y Y Y -
Germany P 2020-03-27 N Y N Y
Greece - 2020-03-27 A N -
Iran O 2020-03-26 A Y N -
Israel O -
Italy P 2020-03-25 Y Y N -
Japan P 2020-03-25 Y Y Y Y
Korea, Republic of P 2020-02-03 Y Y N -
Netherlands P 2020-02-28 A Y N -
Norway O -
Poland O -
Portugal O 2020-03-27 A N -
Qatar - 2020-03-26 A N -
Romania O 2020-03-13 Y Y N -
Russian Federation P 2020-03-24 Y Y N -
Serbia O -
South Africa P 2020-03-27 A N -
Spain P 2020-03-27 Y Y Y Y
Sweden P 2020-03-24 A N -
Switzerland P 2020-03-17 A N -
Thailand O -
Turkey O 2020-03-19 A N -
United Arab Emirates - 2020-03-22 A N -
United Kingdom P 2020-03-20 Y Y Y -
United States of America P 2020-03-10 Y Y Y Y

NOTES:


The final result of voting will be indicated in the Report of Voting (RVN), as P-members have the possibility to nominate an expert within four weeks after the closing date.



  • 1. Vote: Does the National Committee approve the addition of the new proposal to the program of work of the committee?
    Y = In favour; N = Against; A = Abstention.

  • 2. Abstentions are not taken into account when totalizing the votes.

  • 3. Only votes received from P-members before the closing date are counted in determining the decision.

  • 4. If approved, should the next stage be a Committee Draft or a Committee Draft for Vote?

  • 5. Is the National Committee prepared to participate in the development of the project? [Y/N]
    Note: Only the participation of those voting in favour of the proposal are taken into account.


P-members not voting: (0)


*Comments not included in the compiled table, available as a separate file, because they were not submitted using the template Form-Comments.