TC 103

Transmitting and receiving equipment for radiocommunication

 

Approval

P-Members

Voting
P-Members

Approving
Approval %
Criteria
Result
9 9 100 >=66.7% APPROVED

Participation

Number of

P-Members
P-Members

approving and

participating
Criteria
Result
11 6 >=4 (if <=16)
>=5 (if >=17)
APPROVED

 Illustration: Voting

Voting Result

APPROVED

Document 103/203/NP

 

Project : IEC 62803-2 ED1

PNW 103-203 ED1: Transmitting equipment for radiocommunication - Frquency response of optical-to-electric conversion device in high-frequency radio over fibre systems
- Part 2 Measurement method of common-mode rejection ratio of optical coherent detection device for radio over fibre transmitter

 

Reference Circulation date Closing date Downloads
103/203/NP 2020-11-13 2021-02-05
Compilation of Comments
CC file    
 
export to xls file

Result of Voting

Country
Status
Received
Approving
CD
CDV
Participation
Comments
Austria O 2021-02-03 A Y N -
Belgium O 2021-02-05 A N -
Bulgaria O -
China P 2021-01-25 Y Y Y -
Czech Republic O -
Denmark O -
Finland O 2020-11-16 A Y N -
France O 2021-01-25 A Y N -
Germany P 2020-11-19 A N Y
Greece O 2021-02-05 A N -
Hungary O -
India O -
Iran O -
Italy P 2021-01-27 Y Y Y -
Japan P 2020-11-17 Y Y Y -
Korea, Republic of P 2021-02-04 Y Y Y -
New Zealand O -
Norway O -
Pakistan P 2021-02-04 Y Y N -
Poland P 2021-02-05 Y Y Y -
Portugal O 2021-02-05 A Y N -
Romania P 2021-02-03 Y Y N -
Russian Federation P 2021-02-04 Y Y N -
Serbia O -
Slovakia O -
Spain O -
Sweden O -
Switzerland P 2020-11-19 A Y N -
Turkey O -
United Arab Emirates - 2021-01-31 Y Y N -
United Kingdom P 2021-01-26 Y Y Y -
United States of America - 2021-02-01 A N -

NOTES:


The final result of voting will be indicated in the Report of Voting (RVN), as P-members have the possibility to nominate an expert within four weeks after the closing date.



  • 1. Vote: Does the National Committee approve the addition of the new proposal to the program of work of the committee?
    Y = In favour; N = Against; A = Abstention.

  • 2. Abstentions are not taken into account when totalizing the votes.

  • 3. Only votes received from P-members before the closing date are counted in determining the decision.

  • 4. If approved, should the next stage be a Committee Draft or a Committee Draft for Vote?

  • 5. Is the National Committee prepared to participate in the development of the project? [Y/N]
    Note: Only the participation of those voting in favour of the proposal are taken into account.


P-members not voting: (0)


*Comments not included in the compiled table, available as a separate file, because they were not submitted using the template Form-Comments.