TC 44

Safety of machinery - Electrotechnical aspects

 

Approval

P-Members

Voting
P-Members

Approving
Approval %
Criteria
Result
12 11 91.7 >=66.7% APPROVED

Participation

Number of

P-Members
P-Members

approving and

participating
Criteria
Result
20 6 >=4 (if <=16)
>=5 (if >=17)
APPROVED

 Illustration: Voting

Voting Result

APPROVED

Document 44/868/NP

 

Project : IEC TS 62998-3 ED1

Replaced by 44/868A/NP

 

Reference Circulation date Closing date Downloads
44/868/NP 2019-12-06 2020-03-13
Compilation of Comments
CC file    
 
export to xls file

Result of Voting

Country
Status
Received
Approving
CD
CDV
Participation
Comments
Australia P 2019-12-15 A N -
Austria O 2020-03-13 A Y N -
Belarus - 2020-03-13 Y Y N -
Belgium P 2020-03-11 A N -
Bulgaria O -
China P 2020-03-02 Y Y Y -
Croatia O -
Czech Republic P 2020-03-11 Y Y N Y
Denmark P 2020-03-13 N N Y
Egypt O -
Finland P 2020-03-12 A Y N -
France P 2020-03-12 A N -
Georgia P -
Germany P 2020-03-02 Y Y Y Y
Greece O 2020-03-12 A N -
Hungary O -
India P 2020-03-13 Y Y N -
Iran O -
Ireland O -
Italy P 2020-03-11 Y Y Y Y
Japan P 2020-03-03 Y Y Y Y
Korea, Republic of O -
Netherlands P 2020-03-03 A Y N -
Norway P 2019-12-10 Y Y N -
Pakistan O 2020-03-09 Y Y N -
Poland O -
Portugal O 2020-03-13 A N -
Qatar - 2020-03-11 Y Y N -
Romania O -
Russian Federation P 2020-03-12 Y Y N -
Serbia O -
Slovenia - 2020-01-24 Y Y N -
South Africa O -
Spain P 2020-03-12 A N -
Sweden P 2020-03-13 Y Y Y -
Switzerland P 2020-02-18 A Y N -
Turkey O -
Ukraine O -
United Kingdom P 2020-03-12 Y Y Y -
United States of America P 2020-03-12 Y Y N -

NOTES:


The final result of voting will be indicated in the Report of Voting (RVN), as P-members have the possibility to nominate an expert within four weeks after the closing date.



  • 1. Vote: Does the National Committee approve the addition of the new proposal to the program of work of the committee?
    Y = In favour; N = Against; A = Abstention.

  • 2. Abstentions are not taken into account when totalizing the votes.

  • 3. Only votes received from P-members before the closing date are counted in determining the decision.

  • 4. If approved, should the next stage be a Committee Draft or a Committee Draft for Vote?

  • 5. Is the National Committee prepared to participate in the development of the project? [Y/N]
    Note: Only the participation of those voting in favour of the proposal are taken into account.


P-members not voting: Georgia(1)


*Comments not included in the compiled table, available as a separate file, because they were not submitted using the template Form-Comments.