International Standards and Conformity Assessment for all electrical, electronic and related technologies

TC 100

Audio, video and multimedia systems and equipment

 

Approval

P-Members

Voting
P-Members

Approving
Approval %
Criteria
Result
9 9 100 >=66.7% APPROVED

Participation

Number of

P-Members
P-Members

approving and

participating
Criteria
Result
16 4 >=4 (if <=16)
>=5 (if >=17)
APPROVED

 Illustration: Voting

Voting Result

APPROVED

Document 100/3446/NP

 

Project : IEC 60728-106 ED1

PNW 100-3446: Optical equipment for systems loaded with digital channels only

 

Reference Circulation date Closing date Downloads
100/3446/NP 2020-06-05 2020-08-28
Compilation of Comments
CC file    
 
export to xls file

Result of Voting

Country
Status
Received
Approving
CD
CDV
Participation
Comments
Australia O -
Austria O 2020-08-27 A Y N -
Belarus O 2020-08-24 Y Y N -
Belgium P 2020-08-27 A N -
Bulgaria O -
China P 2020-08-17 Y Y Y Y
Croatia O -
Czech Republic O -
Denmark O -
Egypt O -
Finland P 2020-06-08 Y Y N -
France P 2020-08-21 A Y N -
Germany P 2020-08-24 Y Y Y -
Greece O 2020-08-02 A N -
Hungary O -
India P 2020-08-28 A N -
Iran O 2020-08-28 A Y N -
Ireland P 2020-07-03 Y Y N -
Israel O -
Italy P 2020-07-16 Y Y N Y
Japan P 2020-07-29 Y Y Y -
Korea, Republic of P 2020-08-28 Y Y N -
Mexico O -
Netherlands O 2020-08-10 Y Y N -
New Zealand O -
Norway O 2020-08-26 A Y N -
Pakistan O 2020-08-21 Y Y N -
Philippines, Rep. of the O -
Poland O -
Portugal O 2020-08-28 A Y N -
Romania O -
Russian Federation P 2020-08-14 Y Y N -
Serbia O -
Slovakia O -
Slovenia O 2020-08-24 Y Y N -
South Africa O -
Spain P 2020-06-25 A N -
Sweden P 2020-08-24 A Y N -
Switzerland P 2020-08-06 A Y N -
Thailand O -
Turkey O 2020-08-28 A N -
Ukraine O 2020-06-18 Y Y N -
United Arab Emirates - 2020-08-27 A N -
United Kingdom P 2020-07-22 Y Y Y -
United States of America P 2020-07-27 A Y N -

NOTES:


The final result of voting will be indicated in the Report of Voting (RVN), as P-members have the possibility to nominate an expert within four weeks after the closing date.



  • 1. Vote: Does the National Committee approve the addition of the new proposal to the program of work of the committee?
    Y = In favour; N = Against; A = Abstention.

  • 2. Abstentions are not taken into account when totalizing the votes.

  • 3. Only votes received from P-members before the closing date are counted in determining the decision.

  • 4. If approved, should the next stage be a Committee Draft or a Committee Draft for Vote?

  • 5. Is the National Committee prepared to participate in the development of the project? [Y/N]
    Note: Only the participation of those voting in favour of the proposal are taken into account.


P-members not voting: (0)


*Comments not included in the compiled table, available as a separate file, because they were not submitted using the template Form-Comments.