TC 86

Fibre optics

 

Approval

P-Members

Voting
P-Members

Approving
Approval %
Criteria
Result
11 11 100 >=66.7% APPROVED

Participation

Number of

P-Members
P-Members

approving and

participating
Criteria
Result
22 5 >=4 (if <=16)
>=5 (if >=17)
APPROVED

 Illustration: Voting

Voting Result

APPROVED

Document 86/565/NP

 

Project : IEC 62496-4-3 ED1

PNW 86-565:

Optical circuit boards - Part 4-21X: Interface standards - Terminated waveguide OCB assembly using a single-row thirty-two-channel PMT connector intermateable with 250 μm pitch MPO 16

 

Reference Circulation date Closing date Downloads
86/565/NP 2020-07-17 2020-10-09
Compilation of Comments
CC file    
 
export to xls file

Result of Voting

Country
Status
Received
Approving
CD
CDV
Participation
Comments
Australia O -
Austria P 2020-10-07 A Y N -
Belarus - 2020-10-05 Y Y N -
Belgium P 2020-10-09 A N -
Brazil O 2020-10-08 A N -
Bulgaria O -
Canada P 2020-09-23 Y Y Y -
China P 2020-09-28 Y Y Y Y
Czech Republic O -
Denmark O 2020-10-08 Y Y N -
Finland P 2020-10-07 Y Y N -
France P 2020-10-05 Y Y Y -
Germany P 2020-10-05 Y Y N -
Greece O 2020-10-09 Y Y N -
Hungary O -
India P 2020-10-09 A N -
Indonesia O -
Iran O 2020-10-09 A Y N -
Ireland O -
Israel O -
Italy P 2020-10-01 Y Y Y -
Japan P 2020-10-09 A Y N Y
Korea, Republic of P 2020-10-09 Y Y N -
Mexico P 2020-10-08 A Y N -
Netherlands P 2020-09-20 A Y N -
New Zealand O -
Norway O 2020-10-08 A Y N -
Pakistan O -
Poland P 2020-10-09 Y Y N -
Portugal O 2020-10-09 A Y N -
Romania O -
Russian Federation P 2020-10-09 Y Y N -
Saudi Arabia O -
Serbia O -
Slovakia - 2020-09-25 Y Y N -
Slovenia O -
South Africa P 2020-10-09 A N -
Spain P 2020-10-05 A N -
Sweden P 2020-10-01 A Y N -
Switzerland P 2020-10-07 A N -
Thailand P 2020-10-07 Y Y N -
Turkey O -
Ukraine O -
United Kingdom P 2020-09-15 A Y N -
United States of America P 2020-10-08 Y Y Y -

NOTES:


The final result of voting will be indicated in the Report of Voting (RVN), as P-members have the possibility to nominate an expert within four weeks after the closing date.



  • 1. Vote: Does the National Committee approve the addition of the new proposal to the program of work of the committee?
    Y = In favour; N = Against; A = Abstention.

  • 2. Abstentions are not taken into account when totalizing the votes.

  • 3. Only votes received from P-members before the closing date are counted in determining the decision.

  • 4. If approved, should the next stage be a Committee Draft or a Committee Draft for Vote?

  • 5. Is the National Committee prepared to participate in the development of the project? [Y/N]
    Note: Only the participation of those voting in favour of the proposal are taken into account.


P-members not voting: (0)


*Comments not included in the compiled table, available as a separate file, because they were not submitted using the template Form-Comments.