TC 82

Solar photovoltaic energy systems

 

Approval

P-Members

Voting
P-Members

Approving
Approval %
Criteria
Result
27 26 96.3 >=66.7% APPROVED

Participation

Number of

P-Members
P-Members

approving and

participating
Criteria
Result
43 10 >=4 (if <=16)
>=5 (if >=17)
APPROVED

 Illustration: Voting

Voting Result

APPROVED

Document 82/1799/NP

 

Project : IEC TS 62446-4 ED1

PNW TS 82-1799 ED1: On-Line Measurement for Electroluminescence of Photovoltaic Array

 

Reference Circulation date Closing date Downloads
82/1799/NP 2020-09-18 2020-12-11
Compilation of Comments
CC file    
 
export to xls file

Result of Voting

Country
Status
Received
Approving
CD
CDV
Participation
Comments
Algeria O -
Australia P 2020-10-30 Y Y N -
Austria P 2020-12-11 Y Y N -
Bahrain P 2020-12-05 A Y N -
Belgium P 2020-12-10 A N -
Brazil O 2020-12-11 A N -
Bulgaria O -
Canada P 2020-11-26 Y Y N Y
Chile O -
China P 2020-11-30 Y Y Y Y
Czech Republic P 2020-12-11 Y Y N -
Côte D'Ivoire P 2020-10-12 A Y N -
Denmark P 2020-11-10 Y Y Y -
Egypt P -
Finland P 2020-12-07 A Y N -
France P 2020-12-03 A Y N -
Germany P 2020-12-11 Y Y Y Y
Greece P 2020-12-11 Y Y N -
Hungary O -
India P 2020-12-09 Y Y N -
Indonesia P 2020-11-11 Y Y N -
Iran P 2020-12-09 A Y N -
Ireland P 2020-10-27 Y Y N -
Israel P 2020-12-10 A N -
Italy P 2020-12-03 Y Y Y Y
Japan P 2020-12-11 Y Y N -
Kenya P 2020-12-10 A Y N -
Korea, Republic of P 2020-12-04 Y Y Y Y
Malaysia P 2020-12-04 Y Y N -
Mexico P 2020-12-10 Y Y N -
Morocco P -
Netherlands P 2020-12-07 N N Y
New Zealand P 2020-12-06 A Y N -
Nigeria P -
Norway P 2020-12-11 Y Y N -
Oman O -
Poland O -
Portugal P 2020-12-11 A Y N -
Qatar P -
Romania P 2020-12-11 Y Y N -
Russian Federation P 2020-11-09 Y Y N -
Saudi Arabia P -
Serbia O -
Singapore P 2020-11-12 Y Y N -
Slovenia O 2020-12-10 Y Y N -
South Africa P 2020-12-11 Y Y Y -
Spain P 2020-12-11 Y Y Y -
Sweden P 2020-12-10 A Y N -
Switzerland P 2020-12-07 Y Y Y -
Thailand P 2020-12-09 Y Y N -
Turkey O 2020-12-07 A N -
Ukraine O -
United Kingdom P 2020-12-11 Y Y Y Y
United States of America P 2020-12-09 Y Y Y Y

NOTES:


The final result of voting will be indicated in the Report of Voting (RVN), as P-members have the possibility to nominate an expert within four weeks after the closing date.



  • 1. Vote: Does the National Committee approve the addition of the new proposal to the program of work of the committee?
    Y = In favour; N = Against; A = Abstention.

  • 2. Abstentions are not taken into account when totalizing the votes.

  • 3. Only votes received from P-members before the closing date are counted in determining the decision.

  • 4. If approved, should the next stage be a Committee Draft or a Committee Draft for Vote?

  • 5. Is the National Committee prepared to participate in the development of the project? [Y/N]
    Note: Only the participation of those voting in favour of the proposal are taken into account.


P-members not voting: Egypt; Morocco; Nigeria; Qatar; Saudi Arabia(5)


*Comments not included in the compiled table, available as a separate file, because they were not submitted using the template Form-Comments.