TC 57

Power systems management and associated information exchange

 

Approval

P-Members

Voting
P-Members

Approving
Approval %
Criteria
Result
22 18 81.8 >=66.7% APPROVED

Participation

Number of

P-Members
P-Members

approving and

participating
Criteria
Result
36 5 >=4 (if <=16)
>=5 (if >=17)
APPROVED

 Illustration: Voting

Voting Result

APPROVED

Document 57/2235/NP

 

Project : IEC TS 63353 ED1

PNW TS 57-2235: IIoT applications in power distribution systems management: Architecture and functional requirements

 

Reference Circulation date Closing date Downloads
57/2235/NP 2020-06-12 2020-09-04
Compilation of Comments
CC file    
 
export to xls file

Result of Voting

Country
Status
Received
Approving
CD
CDV
Participation
Comments
Argentina P 2020-08-31 Y Y N -
Australia P 2020-08-31 A N -
Austria P 2020-09-03 Y Y Y -
Belarus O 2020-09-01 Y Y N -
Belgium P 2020-09-03 A N -
Brazil P 2020-09-04 Y Y N -
Bulgaria O -
Canada P 2020-09-04 N N Y
China P 2020-08-24 Y Y Y -
Croatia P 2020-09-04 A N -
Czech Republic P 2020-09-03 Y Y N -
Denmark P 2020-09-04 A N -
Egypt P -
Finland P 2020-08-31 A Y N -
France P 2020-09-03 Y Y Y Y
Germany P 2020-08-13 Y Y N Y
Hungary P 2020-06-26 A Y N -
India P 2020-08-26 A N -
Iran P 2020-09-03 A Y N -
Ireland O -
Israel P 2020-09-02 A N -
Italy P 2020-09-04 Y Y N Y
Japan P 2020-09-02 N Y N Y
Korea, Republic of P 2020-09-04 Y Y Y Y
Malaysia P 2020-06-17 Y Y N -
Mexico O 2020-09-03 Y Y N -
Netherlands P 2020-08-25 Y Y N -
New Zealand O -
North Macedonia P 2020-07-03 A N -
Norway P 2020-09-04 A N -
Oman O -
Poland O -
Portugal P 2020-09-04 A Y N -
Romania O 2020-08-27 Y Y N -
Russian Federation P 2020-09-03 Y Y N -
Serbia P 2020-07-30 Y Y N -
Slovakia O -
Slovenia P 2020-09-04 Y Y N -
South Africa P 2020-09-04 A N -
Spain P 2020-09-01 Y Y N -
Sweden P 2020-09-04 Y Y N Y
Switzerland P 2020-09-04 N N Y
Turkey O -
Ukraine P 2020-06-25 Y Y N -
United Arab Emirates - 2020-09-01 Y Y N -
United Kingdom P 2020-07-29 Y Y Y -
United States of America P 2020-09-01 N N Y

NOTES:


The final result of voting will be indicated in the Report of Voting (RVN), as P-members have the possibility to nominate an expert within four weeks after the closing date.



  • 1. Vote: Does the National Committee approve the addition of the new proposal to the program of work of the committee?
    Y = In favour; N = Against; A = Abstention.

  • 2. Abstentions are not taken into account when totalizing the votes.

  • 3. Only votes received from P-members before the closing date are counted in determining the decision.

  • 4. If approved, should the next stage be a Committee Draft or a Committee Draft for Vote?

  • 5. Is the National Committee prepared to participate in the development of the project? [Y/N]
    Note: Only the participation of those voting in favour of the proposal are taken into account.


P-members not voting: Egypt(1)


*Comments not included in the compiled table, available as a separate file, because they were not submitted using the template Form-Comments.