International Standards and Conformity Assessment for all electrical, electronic and related technologies

TC 78

Live working

 

Approval

P-Members

Voting
P-Members

Approving
Approval %
Criteria
Result
14 11 78.6 >=66.7% APPROVED

Participation

Number of

P-Members
P-Members

approving and

participating
Criteria
Result
25 2 >=4 (if <=16)
>=5 (if >=17)
REJECTED

 Illustration: Voting

Voting Result

REJECTED

Document 78/1305/NP

 

Project : PNW 78-1305

PNW 78-1305: Live Working – Footwear for Electrical Protection – Footwear and Overboots with Electrical Insulating Outsole

 

Reference Circulation date Closing date Downloads
78/1305/NP 2019-12-06 2020-02-28
Compilation of Comments
CC file    
 
export to xls file

Result of Voting

Country
Status
Received
Approving
CD
CDV
Participation
Comments
Argentina P 2020-02-28 A N -
Australia O -
Austria O -
Belarus O 2020-02-28 Y Y N -
Belgium P 2020-02-28 A N -
Brazil P 2020-02-28 A N -
Bulgaria O -
Canada P 2020-02-19 N Y N Y
China P 2020-02-17 Y Y N -
Czech Republic P 2020-02-26 Y Y N -
Denmark P 2020-02-19 A Y N -
Egypt P 2020-02-24 Y Y N Y
Finland P 2020-02-27 Y Y N -
France P 2020-02-25 Y Y Y Y
Germany P 2020-02-10 Y Y Y -
Greece O 2020-02-27 A N -
Hungary P 2020-02-28 A Y N -
India O -
Iran O -
Ireland O -
Israel O -
Italy P 2020-02-28 N Y N Y
Japan P 2020-02-25 Y Y N -
Korea, Republic of O -
Malaysia P 2020-01-13 A N -
Netherlands P 2020-02-17 A N -
New Zealand O -
Norway P 2020-02-28 A N -
Poland O -
Portugal O 2020-02-28 A N -
Qatar - 2020-02-26 Y Y N -
Romania O 2020-02-21 Y Y N -
Russian Federation P 2020-02-27 Y Y N -
Serbia O -
Slovakia P 2020-02-28 Y Y N -
Slovenia O 2020-02-28 Y Y N -
South Africa P 2020-02-28 A N -
Spain P 2020-02-28 Y Y N -
Sweden P 2020-02-27 A N -
Switzerland P 2020-02-17 A Y N -
Ukraine O -
United Arab Emirates - 2020-02-24 A N -
United Kingdom P 2020-02-25 N Y Y
United States of America P 2020-02-27 Y Y N Y

NOTES:


The final result of voting will be indicated in the Report of Voting (RVN), as P-members have the possibility to nominate an expert within four weeks after the closing date.



  • 1. Vote: Does the National Committee approve the addition of the new proposal to the program of work of the committee?
    Y = In favour; N = Against; A = Abstention.

  • 2. Abstentions are not taken into account when totalizing the votes.

  • 3. Only votes received from P-members before the closing date are counted in determining the decision.

  • 4. If approved, should the next stage be a Committee Draft or a Committee Draft for Vote?

  • 5. Is the National Committee prepared to participate in the development of the project? [Y/N]
    Note: Only the participation of those voting in favour of the proposal are taken into account.


P-members not voting: (0)


*Comments not included in the compiled table, available as a separate file, because they were not submitted using the template Form-Comments.