International Standards and Conformity Assessment for all electrical, electronic and related technologies

TC 47

Semiconductor devices

 

Approval

P-Members

Voting
P-Members

Approving
Approval %
Criteria
Result
10 9 90 >=66.7% APPROVED

Participation

Number of

P-Members
P-Members

approving and

participating
Criteria
Result
14 4 >=4 (if <=16)
>=5 (if >=17)
APPROVED

 Illustration: Voting

Voting Result

APPROVED

Document 47/2610/NP

 

Project : IEC 62951-9 ED1

PNW 47-2610: Future IEC 62951-9: Semiconductor devices - Flexible and strechable semiconductor devices – Part 9: Performance and reliability testing methods of  one transistor and one resistor (1T1R) resistive memory cells

 

Reference Circulation date Closing date Downloads
47/2610/NP 2019-12-06 2020-02-28
Compilation of Comments
CC file    
 
export to xls file

Result of Voting

Country
Status
Received
Approving
CD
CDV
Participation
Comments
Austria P 2020-02-27 A Y N -
Belarus O 2020-02-28 Y Y N -
Belgium P 2020-02-28 A N -
Brazil O 2020-02-28 A N -
Bulgaria O -
China P 2020-02-17 Y Y N -
Czech Republic O -
Denmark O -
Finland O 2020-02-25 A N -
France P 2020-01-31 A Y N -
Germany P 2020-02-26 Y Y Y Y
Greece - 2020-02-27 A N -
Hungary O -
India O 2020-02-28 A N -
Iran O -
Ireland O -
Italy P 2020-02-27 Y Y N -
Japan P 2020-02-28 N N Y
Korea, Republic of P 2020-02-28 Y Y Y -
Netherlands P 2020-02-18 A N -
Norway O -
Pakistan P 2020-02-24 Y Y N -
Philippines, Rep. of the O -
Poland O -
Portugal - 2020-02-28 A N -
Qatar - 2020-02-26 A N -
Romania O 2020-02-21 A N -
Russian Federation P 2020-02-27 Y Y N -
Serbia O -
Singapore P 2019-12-10 Y Y N -
Spain O -
Sweden O 2020-02-28 A N -
Switzerland O -
Thailand O -
Turkey O -
Ukraine O -
United Arab Emirates - 2020-02-24 A N -
United Kingdom P 2020-02-13 Y Y Y -
United States of America P 2020-02-28 Y Y Y -

NOTES:


The final result of voting will be indicated in the Report of Voting (RVN), as P-members have the possibility to nominate an expert within four weeks after the closing date.



  • 1. Vote: Does the National Committee approve the addition of the new proposal to the program of work of the committee?
    Y = In favour; N = Against; A = Abstention.

  • 2. Abstentions are not taken into account when totalizing the votes.

  • 3. Only votes received from P-members before the closing date are counted in determining the decision.

  • 4. If approved, should the next stage be a Committee Draft or a Committee Draft for Vote?

  • 5. Is the National Committee prepared to participate in the development of the project? [Y/N]
    Note: Only the participation of those voting in favour of the proposal are taken into account.


P-members not voting: (0)


*Comments not included in the compiled table, available as a separate file, because they were not submitted using the template Form-Comments.