TC 4

Hydraulic turbines

 

Approval

P-Members

Voting
P-Members

Approving
Approval %
Criteria
Result
11 10 90.9 >=66.7% APPROVED

Participation

Number of

P-Members
P-Members

approving and

participating
Criteria
Result
17 5 >=4 (if <=16)
>=5 (if >=17)
APPROVED

 Illustration: Voting

Voting Result

APPROVED

Document 4/406/NP

 

Project : IEC TS 63390 ED1

PNW TS 4-406 ED1: Technical Specifications for Digitalization of Operation and Maintenance in Hydropower Assets

 

Reference Circulation date Closing date Downloads
4/406/NP 2021-03-19 2021-04-16
Compilation of Comments
CC file    
 
export to xls file

Result of Voting

Country
Status
Received
Approving
CD
CDV
Participation
Comments
Austria P 2021-04-14 Y Y Y -
Belgium P 2021-04-16 A N -
Canada P 2021-04-09 Y Y Y -
China P 2021-04-06 Y Y Y -
Czech Republic P 2021-04-14 A N -
Democratic People's Republic of Korea - 2021-04-11 Y Y N -
Egypt O -
Finland O 2021-04-12 A Y N -
France P 2021-03-30 Y Y Y -
Germany P 2021-04-15 A N -
Greece O 2021-04-16 A N -
Hungary O -
India P 2021-04-15 Y Y N -
Indonesia O -
Iran O 2021-04-14 Y Y N Y
Ireland O -
Israel O -
Italy P 2021-04-16 Y Y N -
Japan P 2021-04-12 Y Y N -
Korea, Republic of O 2021-04-15 Y Y N -
Malaysia O -
Mexico O 2021-04-16 A Y N -
Netherlands O -
New Zealand O -
Norway P 2021-04-16 A N -
Poland O -
Portugal - 2021-04-16 A Y N -
Romania O -
Russian Federation P 2021-04-16 A Y N -
Serbia O -
Slovenia P 2021-03-30 Y Y N -
Spain O -
Sweden P 2021-04-16 Y Y N -
Switzerland P 2021-03-26 Y Y Y -
Ukraine O -
United Arab Emirates - 2021-04-12 Y Y N -
United Kingdom P 2021-04-07 A N -
United States of America P 2021-04-16 N N Y

NOTES:


The final result of voting will be indicated in the Report of Voting (RVN), as P-members have the possibility to nominate an expert within four weeks after the closing date.



  • 1. Vote: Does the National Committee approve the addition of the new proposal to the program of work of the committee?
    Y = In favour; N = Against; A = Abstention.

  • 2. Abstentions are not taken into account when totalizing the votes.

  • 3. Only votes received from P-members before the closing date are counted in determining the decision.

  • 4. If approved, should the next stage be a Committee Draft or a Committee Draft for Vote?

  • 5. Is the National Committee prepared to participate in the development of the project? [Y/N]
    Note: Only the participation of those voting in favour of the proposal are taken into account.


P-members not voting: (0)


*Comments not included in the compiled table, available as a separate file, because they were not submitted using the template Form-Comments.