TC 3

Documentation, graphical symbols and representations of technical information

 

Approval

P-Members

Voting
P-Members

Approving
Approval %
Criteria
Result
10 10 100 >=66.7% APPROVED

Participation

Number of

P-Members
P-Members

approving and

participating
Criteria
Result
17 3 >=4 (if <=16)
>=5 (if >=17)
REJECTED

 Illustration: Voting

Voting Result

Document 3/1473/NP

 

Project : PNW 3-1473 ED1

PNW 3-1473 ED1: Industrial systems, installations and equipment and industrial products -- Structuring principles and reference designations -- Part 101: Power plants -- Modelling concepts and guidelines

 

Reference Circulation date Closing date Downloads
3/1473/NP 2021-01-15 2021-04-09
Compilation of Comments
CC file    
 
export to xls file

Result of Voting

Country
Status
Received
Approving
CD
CDV
Participation
Comments
Austria P 2021-04-08 A Y N -
Belgium O 2021-04-08 A N -
Bulgaria O -
China P 2021-04-06 Y Y Y Y
Czech Republic P 2021-04-09 Y Y N -
Democratic People's Republic of Korea - 2021-04-04 Y Y N -
Denmark P 2021-02-10 Y Y Y -
Egypt O -
Finland P 2021-03-09 A Y N -
France P 2021-04-08 A N -
Germany P 2021-04-07 Y Y N Y
Greece - 2021-04-09 A N -
Hungary O -
India P 2021-04-07 Y Y N -
Iran O 2021-04-07 A Y N -
Israel O -
Italy P 2021-04-09 A N -
Japan P 2021-04-08 Y Y Y -
Korea, Republic of O -
Netherlands P 2021-04-06 A N -
Norway P 2021-04-09 Y Y N Y
Pakistan P 2021-04-08 Y Y N -
Poland O -
Portugal O 2021-04-08 A Y N -
Romania O -
Russian Federation P 2021-04-06 A Y N -
Serbia O -
Singapore O -
Slovenia O 2021-04-07 Y Y N -
Spain O -
Sweden P 2021-04-07 Y Y N Y
Switzerland O -
Ukraine O -
United Arab Emirates - 2021-04-08 Y Y N -
United Kingdom P 2021-03-17 A N -
United States of America P 2021-04-08 Y Y N -

NOTES:


The final result of voting will be indicated in the Report of Voting (RVN), as P-members have the possibility to nominate an expert within four weeks after the closing date.



  • 1. Vote: Does the National Committee approve the addition of the new proposal to the program of work of the committee?
    Y = In favour; N = Against; A = Abstention.

  • 2. Abstentions are not taken into account when totalizing the votes.

  • 3. Only votes received from P-members before the closing date are counted in determining the decision.

  • 4. If approved, should the next stage be a Committee Draft or a Committee Draft for Vote?

  • 5. Is the National Committee prepared to participate in the development of the project? [Y/N]
    Note: Only the participation of those voting in favour of the proposal are taken into account.


P-members not voting: (0)


*Comments not included in the compiled table, available as a separate file, because they were not submitted using the template Form-Comments.