TC 33

Power capacitors and their applications

 

Approval

P-Members

Voting
P-Members

Approving
Approval %
Criteria
Result
14 9 64.3 >=66.7% REJECTED

Participation

Number of

P-Members
P-Members

approving and

participating
Criteria
Result
20 2 >=4 (if <=16)
>=5 (if >=17)
REJECTED

 Illustration: Voting

Voting Result

REJECTED

Document 33/645/NP

 

Project : PNW TS 33-645

PNW TS 33-645: Noise measurement method on power capacitors

 

Reference Circulation date Closing date Downloads
33/645/NP 2019-12-13 2020-03-06
Compilation of Comments
CC file    
 
export to xls file

Result of Voting

Country
Status
Received
Approving
CD
CDV
Participation
Comments
Austria P 2020-03-06 A Y N -
Belgium P 2020-02-28 N N Y
Brazil P 2020-03-06 Y Y N -
Bulgaria O -
Canada P 2020-02-21 Y Y N Y
China P 2020-02-24 Y Y Y -
Czech Republic P 2020-03-06 A N -
Denmark O -
Egypt P 2020-03-05 Y Y N Y
Finland P 2020-03-05 Y Y N -
France P 2020-03-02 Y Y Y -
Germany P 2020-02-21 N Y N Y
Greece - 2020-03-06 A N -
India P 2020-03-06 N Y N Y
Iran O -
Ireland O -
Israel O -
Italy P 2020-03-06 A N -
Japan P 2020-03-06 Y Y N Y
Korea, Republic of P 2020-03-06 Y Y N -
Mexico O 2020-03-06 Y Y N -
Norway O -
Oman O -
Poland O -
Portugal O 2020-03-06 A N -
Qatar - 2020-03-04 Y Y N -
Romania O -
Russian Federation P 2020-03-05 Y Y N -
Serbia O -
South Africa O -
Spain P 2020-03-06 A N -
Sweden P 2020-03-05 N Y N Y
Switzerland P 2020-02-17 A Y N -
Thailand O -
Turkey O -
Ukraine O -
United Arab Emirates - 2020-03-05 A N -
United Kingdom P 2020-03-05 A Y N -
United States of America P 2020-03-06 N Y N Y

NOTES:


The final result of voting will be indicated in the Report of Voting (RVN), as P-members have the possibility to nominate an expert within four weeks after the closing date.



  • 1. Vote: Does the National Committee approve the addition of the new proposal to the program of work of the committee?
    Y = In favour; N = Against; A = Abstention.

  • 2. Abstentions are not taken into account when totalizing the votes.

  • 3. Only votes received from P-members before the closing date are counted in determining the decision.

  • 4. If approved, should the next stage be a Committee Draft or a Committee Draft for Vote?

  • 5. Is the National Committee prepared to participate in the development of the project? [Y/N]
    Note: Only the participation of those voting in favour of the proposal are taken into account.


P-members not voting: (0)


*Comments not included in the compiled table, available as a separate file, because they were not submitted using the template Form-Comments.