SC 121A

Low-voltage switchgear and controlgear

 

Approval

P-Members

Voting
P-Members

Approving
Approval %
Criteria
Result
25 25 100 >=66.7% APPROVED

Participation

Number of

P-Members
P-Members

approving and

participating
Criteria
Result
31 7 >=4 (if <=16)
>=5 (if >=17)
APPROVED

 Illustration: Voting

Voting Result

APPROVED

Document 121A/381/NP

 

Project : IEC 60947-10 ED1

PNW 121A-381: Low-voltage switchgear and controlgear – Part 10: Semiconductor circuit-breakers

 

Reference Circulation date Closing date Downloads
121A/381/NP 2020-08-28 2020-11-20
Compilation of Comments
CC file    
 
export to xls file

Result of Voting

Country
Status
Received
Approving
CD
CDV
Participation
Comments
Argentina O 2020-11-13 Y Y N -
Australia P 2020-11-16 A N -
Austria P 2020-11-16 Y Y Y Y
Belarus O 2020-11-16 Y Y N -
Belgium P 2020-11-20 A N -
Brazil P 2020-11-20 Y Y N -
Bulgaria O -
Canada P 2020-11-09 A Y N -
China P 2020-11-09 Y Y N -
Croatia O -
Czech Republic P 2020-11-16 Y Y N -
Denmark P 2020-11-20 Y Y N -
Egypt P 2020-11-20 Y Y N -
Finland P 2020-11-18 Y Y N -
France P 2020-11-18 Y Y Y Y
Germany P 2020-11-17 Y Y Y Y
Greece O 2020-11-19 A N -
Hungary O -
India P 2020-11-20 Y Y N -
Indonesia P 2020-09-14 Y Y N -
Iran O 2020-11-18 A Y N -
Ireland P 2020-10-02 Y Y N -
Israel P 2020-11-19 A N -
Italy P 2020-10-22 Y Y Y Y
Japan P 2020-11-16 Y Y N -
Korea, Republic of P 2020-11-20 Y Y N -
Malaysia O -
Mexico O 2020-11-19 Y Y N -
Netherlands P 2020-11-18 Y Y N Y
New Zealand O -
Norway O 2020-11-20 A N -
Oman O -
Philippines, Rep. of the O -
Poland P 2020-11-19 Y Y N -
Portugal P 2020-11-20 A Y N -
Romania O 2020-11-20 Y Y N -
Russian Federation P 2020-11-16 Y Y N -
Saudi Arabia O -
Serbia P 2020-11-18 Y Y N Y
Singapore O -
Slovakia O -
Slovenia P 2020-09-23 Y Y N -
South Africa P 2020-11-20 A N -
Spain P 2020-11-03 Y Y N -
Sweden P 2020-09-10 Y Y N -
Switzerland P 2020-11-03 Y Y Y -
Thailand O -
Turkey O 2020-11-16 A N -
Ukraine O -
United Arab Emirates - 2020-11-19 Y Y N -
United Kingdom P 2020-10-28 Y Y Y Y
United States of America P 2020-11-12 Y Y Y Y

NOTES:


The final result of voting will be indicated in the Report of Voting (RVN), as P-members have the possibility to nominate an expert within four weeks after the closing date.



  • 1. Vote: Does the National Committee approve the addition of the new proposal to the program of work of the committee?
    Y = In favour; N = Against; A = Abstention.

  • 2. Abstentions are not taken into account when totalizing the votes.

  • 3. Only votes received from P-members before the closing date are counted in determining the decision.

  • 4. If approved, should the next stage be a Committee Draft or a Committee Draft for Vote?

  • 5. Is the National Committee prepared to participate in the development of the project? [Y/N]
    Note: Only the participation of those voting in favour of the proposal are taken into account.


P-members not voting: (0)


*Comments not included in the compiled table, available as a separate file, because they were not submitted using the template Form-Comments.