TC 77

Electromagnetic compatibility

 

Detail

Committee
Working Groups
Project Leader

Current

Status

Frcst Pub

Date

Stability

Date

TC 77 PPUB 2022

History

Stage
Document
Downloads
Decision Date
Target Date
PPUB
1984-12-30 
  

Abstract

Deals with transient phenomena which are not line-frequency related and are of duration no greater than 40 ms. Is also not concerned with sustained voltage changes or fluctuations. Has the status of a technical report.

Project

IEC TS 60816:1984 ED1

Guide on methods of measurement of short duration transients on low-voltage power and signal lines

 

 

Associated Documents:

77/553/DL

PDF file 145 kB
77/186/RVS

 
77B/499/MCR

PDF file 116 kB