TC 89 |
Fire hazard testing |

Detail
Committee | Working Groups | Project Leader | Current Status |
Frcst Pub Date | Stability Date |
---|---|---|---|---|---|
TC 89 | WG 12 | Dan O'Shea | PPUB | 2010-10 | 2021 |
History
Stage | Document | Downloads | Decision Date | Target Date | ||
---|---|---|---|---|---|---|
AMW |
| 2003-06-06 | ||||
1CD |
| 2005-01-14 | 2005-06 | |||
A2CD |
| 2005-05-27 | 2005-05 | |||
2CD |
| 2005-05-27 | 2005-05 | |||
CDM |
| 2005-09-09 | 2005-10 | |||
A3CD |
| 2005-11-11 | 2005-11 | |||
3CD |
| 2006-01-06 | 2006-01 | |||
3CD |
| 2006-03-10 | ||||
CDM |
| 2006-04-28 | 2006-05 | |||
CDM |
| 2006-06-16 | 2006-06 | |||
PWI | 2006-11-10 | 2006-11 | ||||
PNW |
| 2007-04-27 | 2007-05 | |||
PNW |
| 2007-04-27 | 2007-05 | |||
ANW |
| 2007-04-27 | 2007-09 | |||
1CD |
| 2007-07-13 | 2007-05 | |||
A2CD |
| 2007-11-02 | 2007-11 | |||
2CD |
| 2008-07-25 | 2008-01 | |||
ACDV |
| 2008-11-28 | 2008-11 | |||
CCDV |
| 2009-04-03 | 2009-01 | |||
AFDIS |
| 2009-09-11 | 2009-12 | |||
AFDIS |
| 2009-09-11 | 2009-12 | |||
DECFDIS | 2010-01-22 | 2010-04 | ||||
RFDIS | 2010-02-01 | 2010-02 | ||||
BWG |
| 2010-03-05 | 2010-09 | |||
DECFDIS | 2010-06-22 | 2010-04 | ||||
RFDIS | 2010-07-01 | 2010-07 | ||||
CFDIS |
| 2010-07-23 | 2010-09 | |||
APUB |
| 2010-10-01 | 2010-09 | |||
BPUB | 2010-10-02 | 2010-10 | ||||
PPUB | 2010-10-11 | 2010-11 | ||||
2018-03 |
Abstract
IEC 60695-2-13:2010 specifies the details of the glow-wire test to be applied to test specimens of solid electrical insulating materials or other solid materials for ignitability testing to determine the glow-wire ignition temperature (GWIT). The GWIT is the temperature which is 25 K (or 30 K) higher than the maximum test temperature, determined during this standardized procedure, at which the tested material does not ignite, or if sustained and continuous flaming combustion does not occur for a time longer than 5 s for any single flame event and the specimen is not totally consumed. This second edition of IEC 60695-2-13 cancels and replaces the first edition published in 2000. It also constitutes a technical revision. The main changes with respect to the previous edition are:
- modified title;
- addition of an Introduction;
- clarification of Scope;
- expansion of Clause 2: Normative references;
- expansion of Clause 3;
- revision of Clause 4 to alignment with the IEC 60695-11 series to introduce guidance on test programs for material variations;
- clarification of Clause 8: Conditioning (now Clause 7);
- deletion of Clause 9: Initial measurement;
- expansion of Clause 10: Test procedures (now Clause 8);
- expansion of Clause 11: Observation and measurement (now Clause 9);
- clarification of Clause 12: Evaluation of test results (now Clause 10);
- expansion of Clause 13: Test report (now Clause 11).
This publication is to be read in conjunction with IEC 60695-2-10:2000. The contents of the corrigendum of February 2012 have been included in this copy.
- modified title;
- addition of an Introduction;
- clarification of Scope;
- expansion of Clause 2: Normative references;
- expansion of Clause 3;
- revision of Clause 4 to alignment with the IEC 60695-11 series to introduce guidance on test programs for material variations;
- clarification of Clause 8: Conditioning (now Clause 7);
- deletion of Clause 9: Initial measurement;
- expansion of Clause 10: Test procedures (now Clause 8);
- expansion of Clause 11: Observation and measurement (now Clause 9);
- clarification of Clause 12: Evaluation of test results (now Clause 10);
- expansion of Clause 13: Test report (now Clause 11).
This publication is to be read in conjunction with IEC 60695-2-10:2000. The contents of the corrigendum of February 2012 have been included in this copy.
Project
IEC 60695-2-13:2010 ED2
Fire hazard testing - Part 2-13: Glowing/hot-wire based test methods - Glow-wire ignition temperature (GWIT) test method for materials
Associated Documents:
89/791/RM

89/1396/RR

89/1153/RM

89/1092/RQ


89/1085/Q


89/1068/INF


89/1053/DC

89/1052/RQ


89/1038/Q


SMB/3333/DL

SMB/2924/DL

ACOS/426/DC

Related Projects
Amended By - IEC 60695-2-13:2010/AMD1:2014 ED2
Corrected By - IEC 60695-2-13:2010/COR1:2012 ED2
Revised By - IEC 60695-2-13 ED3
Revising - IEC 60695-2-13:2000 ED1
Corrected By - IEC 60695-2-13:2010/COR1:2012 ED2
Revised By - IEC 60695-2-13 ED3
Revising - IEC 60695-2-13:2000 ED1
