SC 121A |
Low-voltage switchgear and controlgear |

Detail
Committee | Working Groups | Project Leader | Current Status |
Frcst Pub Date | Stability Date |
---|---|---|---|---|---|
SC 121A | MT 18 | Mr Neil A Czarnecki | PRVD | 2021-03 | 2022 |
History
Stage | Document | Downloads | Decision Date | Target Date | ||
---|---|---|---|---|---|---|
ACD |
| 2017-12-21 | ||||
CD |
| 2017-12-22 | 2018-01 | |||
PCC | 2018-03-16 | 2018-03 | ||||
A2CD |
| 2018-03-23 | 2018-08 | |||
A2CD |
| 2018-03-23 | 2018-08 | |||
A2CD |
| 2018-03-23 | 2018-08 | |||
2CD |
| 2018-06-22 | 2018-06 | |||
PCC | 2018-09-14 | 2018-09 | ||||
ACDV |
| 2018-09-21 | 2019-03 | |||
A3CD |
| 2019-06-07 | 2019-06 | |||
3CD |
| 2019-06-14 | 2019-06 | |||
PCC | 2019-09-06 | 2019-09 | ||||
ACDV |
| 2019-09-13 | 2019-12 | |||
ACDV |
| 2019-09-13 | 2019-12 | |||
TCDV | 2019-12-19 | 2020-02 | ||||
CCDV |
| 2020-02-07 | 2020-02 | |||
CCDV |
| 2020-02-07 | 2020-02 | |||
PRVC | 2020-05-01 | 2020-05 | ||||
AFDIS |
| 2020-05-15 | 2020-09 | |||
AFDIS |
| 2020-05-15 | 2020-09 | |||
DECFDIS | 2020-10-20 | 2020-10 | ||||
RFDIS | 2020-10-21 | 2020-11 | ||||
CFDIS |
| 2020-12-08 | 2021-01 | |||
PRVD | 2021-01-15 | 2021-01 | ||||
2021-01 |
Abstract
This third edition cancels and replaces the second edition published in 2005, and its Amendment 1:2013. This edition constitutes a technical revision.
This edition includes the following significant technical changes with respect to the previous edition:
– clarification of scope and object;
– clarification of terms and definitions;
– removal of unnecessary definitions;
– modification of characteristics;
– modification of utilization categories definitions;
– introduction of new markings requirements;
– addition of new requirements for clearances and creepage distances;
– addition of new requirements and tests for mechanical and electrical interlocks;
– clarification of transfer sequences;
– modification of requirements for rated short-time withstand currents;
– modification of new requirements for electromagnetic compatibility;
– clarification of performance requirements for CB type TSE, in alignment with requirements stated in IEC 60947-2;
– addition of new test sequence V: Critical load current performance of equipment with DC ratings.
Project
IEC 60947-6-1 ED3
Low-voltage switchgear and controlgear - Part 6-1: Multiple function equipment - Transfer switching equipment
Related Projects
