International Standards and Conformity Assessment for all electrical, electronic and related technologies

SC 65A

System aspects

 

Detail

Committee
Working Groups
Project Leader

Current

Status

Frcst Pub

Date

Stability

Date

SC 65AWG 4Mr Bernd JäkelBPUB2020-112023

History

Stage
Document
Downloads
Decision Date
Target Date
ACD
65A/900/RR PDF file 108 kB
2018-11-16 
CD
65A/907/CD
PDF file 334 kB
2018-11-232018-12
PCC
2019-02-152019-02
ACDV
65A/917/CC PDF file 251 kB
Word file 38 kB
2019-03-082019-12
ACDV
65A/917A/CC PDF file 247 kB
Word file 39 kB
2019-03-082019-12
TCDV
2019-07-022019-08
CCDV
65A/926/CDV
PDF file 278 kB
PDF file 427 kB
2019-08-232019-08
PRVC
2019-11-152019-11
AFDIS
65A/939/RVC PDF file 263 kB
Word file 58 kB
2019-12-202020-06
AFDIS
65A/939A/RVC PDF file 272 kB
Word file 60 kB
2019-12-202020-06
DECFDIS
2020-07-082020-05
RFDIS
2020-07-142020-07
CFDIS
65A/981/FDIS
2020-08-282020-10
CFDIS
65A/981(F)/FDIS
2020-08-282020-10
PRVD
2020-10-092020-10
APUB
65A/992/RVD PDF file 198 kB
2020-10-162020-10
BPUB
2020-10-162020-10
PPUB
 2020-11

Abstract

IEC 61326-2-4:2020 specifies more detailed test configurations, operational conditions and performance criteria than IEC 61326-1 for equipment for
– insulation monitoring according to IEC 61557-8;
– insulation fault location according to IEC 61557-9.
This applies to insulation monitoring devices and for equipment for insulation fault location systems permanently or semi-permanently connected to the distribution system.

Project

IEC 61326-2-4 ED3

Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 2-4: Particular requirements - Test configurations, operational conditions and performance criteria for insulation monitoring devices according to IEC 61557-8 and for equipment for insulation fault location according to IEC 61557-9