SC 17C |
Assemblies |

Detail
Committee | Working Groups | Project Leader | Current Status |
Frcst Pub Date | Stability Date |
---|---|---|---|---|---|
SC 17C | WG 32 | José Luis Sabas Fernández | PPUB | 2016-09 | 2022 |
History
Stage | Document | Downloads | Decision Date | Target Date | ||
---|---|---|---|---|---|---|
PNW |
| 2012-09-21 | ||||
ANW |
| 2013-02-21 | 2013-02 | |||
1CD |
| 2013-11-28 | 2013-12 | |||
A2CD |
| 2014-04-11 | 2014-03 | |||
2CD |
| 2014-05-30 | 2014-05 | |||
CDM |
| 2014-09-26 | 2014-10 | |||
ACDV | 2015-02-13 | 2014-12 | ||||
CCDV |
| 2015-04-24 | 2014-12 | |||
AFDIS |
| 2015-10-23 | 2015-10 | |||
DECFDIS | 2016-04-01 | 2015-12 | ||||
RFDIS | 2016-04-28 | 2016-04 | ||||
CFDIS |
| 2016-06-24 | 2016-07 | |||
APUB |
| 2016-08-19 | 2016-08 | |||
BPUB | 2016-08-22 | 2016-09 | ||||
PPUB | 2016-10-26 | 2016-10 | ||||
2020-08 |
Abstract
IEC 62271-212:2016 specifies the service conditions, rated characteristics, general structural requirements and test methods of the assemblies of the main electrical functional units of a high-voltage/low-voltage distribution substation, duly interconnected, for alternating current of rated operating voltages above 1 kV and up to and including 52 kV on the high-voltage side, service frequency 50 Hz or 60 Hz. This assembly is to be cable-connected to the network, and intended for installation within an indoor or outdoor closed electrical operating area.
This publication is to be read in conjunction with IEC 62271-1:2007
This publication is to be read in conjunction with IEC 62271-1:2007
Project
IEC 62271-212:2016 ED1
High-voltage switchgear and controlgear - Part 212: Compact Equipment Assembly for Distribution Substation (CEADS)
Associated Documents:
17C/757/RR

17C/640/RM

17C/606/INF

17C/578/AC

Related Projects
Revised By - IEC 62271-212 ED2