SC 17C

Assemblies

 

Detail

Committee
Working Groups
Project Leader

Current

Status

Frcst Pub

Date

Stability

Date

SC 17CWG 26 Sabine CharmierPPUB2013-022022

History

Stage
Document
Downloads
Decision Date
Target Date
PNW
17C/424/NP PDF file 584 kB
2008-02-08 
PNW
17C/424A/NP PDF file 88 kB
2008-02-08 
ANW
17C/433B/RVN PDF file 50 kB
2008-07-182008-06
1CD
17C/464/CD PDF file 168 kB
2009-10-232009-10
A2CD
17C/472/CC PDF file 154 kB
2010-02-122010-03
2CD
17C/474/CD PDF file 180 kB
2010-03-192010-03
ACDV
17C/492/CC Word file 241 kB
PDF file 128 kB
2010-10-012010-07
CDTS
17C/515/DTS PDF file 206 kB
PDF file 252 kB
2011-07-082011-05
APUB
17C/548/RVC PDF file 128 kB
2012-03-092012-01
DECPUB
2012-11-232012-06
BPUB
2012-11-292012-12
RPUB
2012-12-12 
PPUB
2013-02-062013-04
  

Abstract

IEC/TS 62271-210:2013 applies to metal enclosed switchgear and controlgear assemblies complying with IEC 62271-200 for metal enclosed and IEC 62271-201 for solid-insulation enclosed, ground or floor mounted, intended to be used under seismic conditions.

Project

IEC TS 62271-210:2013 ED1

High-voltage switchgear and controlgear - Part 210: Seismic qualification for metal enclosed and solid-insulation enclosed switchgear and controlgear assemblies for rated voltages above 1 kV and up to and including 52 kV

 

 

Associated Documents:

17C/640/RM

PDF file 134 kB
17C/585/RM

PDF file 193 kB
17C/514/RQ

PDF file 47 kB
17C/508/Q

Word file 27 kB
PDF file 23 kB
17C/507/INF

PDF file 89 kB
17C/494/DC

PDF file 117 kB
SMB/4536/DL

PDF file 273 kB
SMB/4455/DL

PDF file 258 kB