International Standards and Conformity Assessment for all electrical, electronic and related technologies

TC 57

Power systems management and associated information exchange

 

Detail

Committee
Working Groups
Project Leader

Current

Status

Frcst Pub

Date

Stability

Date

TC 57WG 18 Claes MalcolmPPUB2012-112020

History

Stage
Document
Downloads
Decision Date
Target Date
AMW
57/1016/MCR PDF file 80 kB
2009-07-03 
1CD
57/1038/CD PDF file 442 kB
2009-11-062010-01
ACDV
57/1056/CC Word file 151 kB
PDF file 123 kB
2010-03-192010-03
CCDV
57/1091/CDV PDF file 982 kB
PDF file 1218 kB
2010-10-082010-09
AFDIS
57/1130/RVC PDF file 314 kB
2011-05-202011-06
DECFDIS
2012-06-272011-11
RFDIS
2012-07-092012-07
CFDIS
57/1274/FDIS

2012-08-032012-09
APUB
57/1289/RVD PDF file 198 kB
2012-10-082012-10
BPUB
2012-10-092012-10
PPUB
2012-10-302012-11
 2021-05

Abstract

IEC 61850-7-410:2012 specifies the additional common data classes, logical nodes and data objects required for the use of IEC 61850 in a hydropower plant. The main changes with respect to the previous edition are as follows:
- the logical nodes in IEC 61850-7-410:2007 that were not specific to hydropower plants have been transferred to IEC 61850-7-4:2010;
- the definitions of logical nodes in this edition of IEC 61850-7-410 have been updated;
- most of the modelling examples and background information included in IEC 61850-7-410:2007 have been transferred to IEC/TR 61850-7-510.
This new edition of IEC 61850-7-410 includes additional general-purpose logical nodes that were not included in IEC 61850-7-4:2010, but are required in order to represent the complete control and monitoring system of a hydropower plant.

Project

IEC 61850-7-410:2012 ED2

Communication networks and systems for power utility automation - Part 7-410: Basic communication structure - Hydroelectric power plants - Communication for monitoring and control

 

 

Associated Documents:

57/2263/RR

PDF file 89 kB
SMB/4747/DL

PDF file 233 kB