TC 4 |
Hydraulic turbines |

Detail
Committee | Working Groups | Project Leader | Current Status |
Frcst Pub Date | Stability Date |
---|---|---|---|---|---|
TC 4 | WG 27 | D.R. Webb | PPUB |   | 2021 |
History
Stage | Document | Downloads | Decision Date | Target Date | ||
---|---|---|---|---|---|---|
PNW |
| 1997-10-31 | ||||
ANW |
| 1998-03-15 | 1998-03 | |||
1CD |
| 1999-06-11 | 1998-12 | |||
A2CD |
| 2001-05-25 | 2000-12 | |||
2CD |
| 2001-06-01 | 2001-06 | |||
CDM |
| 2001-09-14 | 2001-09 | |||
ACDV |
| 2002-11-08 | 2002-11 | |||
CCDV |
| 2003-10-10 | 2002-11 | |||
AFDIS |
| 2004-05-21 | 2004-06 | |||
DECFDIS | 2004-06-11 | 2004-10 | ||||
RFDIS | 2004-06-14 | 2004-06 | ||||
CFDIS |
| 2004-08-20 | 2004-09 | |||
APUB |
| 2004-10-25 | 2004-12 | |||
BPUB | 2004-10-26 | 2005-01 | ||||
PPUB | 2004-11-24 | 2005-02 | ||||
Abstract
Provides a basis for the formulation of guarantees applied to cavitation pitting for reaction hydraulic turbines, storage pumps and pump-turbines. It addresses the measurement and evaluation of the amount of cavitation pitting on certain specified machine components for given conditions, which are defined in the contract by output, specific hydraulic energy (E), speed, material, operation, etc. The cavitation-pitting evaluation is based on the loss of material during a given time and under accurately defined operating conditions. All wetted surfaces are considered
Project
IEC 60609-1:2004 ED1
Hydraulic turbines, storage pumps and pump-turbines - Cavitation pitting evaluation - Part 1: Evaluation in reaction turbines, storage pumps and pump-turbines
Associated Documents:
4/320/RM

4/297/RM

4/280/RM

4/252/RM

4/164/RM

CA/1869/MTG

Related Projects
Replacing - IEC 60609:1978 ED1
