TC 35

Primary cells and batteries

 

Detail

Committee
Working Groups
Project Leader

Current

Status

Frcst Pub

Date

Stability

Date

TC 35JMT 18Mr Thomas DittrichPPUB2019-042023

History

Stage
Document
Downloads
Decision Date
Target Date
ACD
35/1383/RR PDF file 88 kB
2017-11-13 
CD
35/1384/CD
PDF file 456 kB
2017-11-172017-11
PCC
2018-02-092018-02
CDM
35/1390/CC PDF file 108 kB
Word file 96 kB
2018-03-022018-05
ACDV
35/1390A/CC PDF file 108 kB
Word file 96 kB
2018-03-302018-06
TCDV
2018-05-032018-06
CCDV
35/1395/CDV
PDF file 469 kB
PDF file 491 kB
2018-06-222018-06
PRVC
2018-09-142018-09
AFDIS
35/1406/RVC PDF file 169 kB
Word file 34 kB
2018-09-212018-10
AFDIS
35/1406A/RVC PDF file 173 kB
Word file 35 kB
2018-09-212018-10
TFDIS
2018-10-182018-10
DECFDIS
2018-11-292018-12
RFDIS
2018-12-042018-12
CFDIS
35/1416/FDIS

2019-01-112019-02
PRVD
2019-02-222019-02
APUB
35/1422/RVD PDF file 154 kB
2019-03-012019-03
BPUB
2019-03-012019-03
PPUB
2019-04-102019-04
 2019-08

Abstract

IEC 62281:2019 is available as IEC 62281:2019 RLV which contains the International Standard and its Redline version, showing all changes of the technical content compared to the previous edition.

IEC 62281:2019 specifies test methods and requirements for primary and secondary (rechargeable) lithium cells and batteries to ensure their safety during transport other than for recycling or disposal. Requirements specified in this document do not apply in those cases where special provisions given in the relevant regulations, listed in 7.3, provide exemptions. NOTE Different standards may apply for lithium-ion traction battery systems used for electrically propelled road vehicles. This fourth edition cancels and replaces the third edition published in 2016. This edition constitutes a technical revision.This edition includes the following significant technical changes with respect to the previous edition:
a) button cell definition revised, moved to coin (cell or battery);
b) addition of provisions for batteries forming an integral part of equipment (5.4);
c) all tests for secondary cells and batteries now also contain a requirement for 25 charge and recharge cycles prior to the test;
d) addition of alternative tables for Table 1 and Table 2 in Annex B;
e) addition of "forcible" to the rupture criteria;
f) test report 6.8 merged with test certificate 6.9 and replaced with the items listed in [13];
g) addition of an informative Annex B with important deviations from the UN Manual of Tests and Criteria, Chapter 38.3.
Keywords: transport of primary lithium cells and batteries

Project

IEC 62281:2019 ED4

Safety of primary and secondary lithium cells and batteries during transport

 

 

Associated Documents:

35/1430/RR

PDF file 88 kB
35/1408/DL

PDF file 88 kB