TC 31

Equipment for explosive atmospheres

 

Detail

Committee
Working Groups
Project Leader

Current

Status

Frcst Pub

Date

Stability

Date

TC 31MT 60079-13 Dalia El-TawyPPUB 2021

History

Stage
Document
Downloads
Decision Date
Target Date
AMW
31/1103/RR PDF file 81 kB
2013-12-20 
CCDV
31/1129/CDV
PDF file 376 kB
PDF file 488 kB
2014-08-152014-02
AFDIS
31/1165/RVC Word file 710 kB
PDF file 424 kB
2014-11-282015-02
AFDIS
31/1165A/RVC Word file 637 kB
PDF file 466 kB
2014-11-282015-02
TFDIS
2016-11-01 
DECFDIS
2016-12-312017-01
RFDIS
2017-01-112017-01
CFDIS
31/1309/FDIS
2017-03-032017-04
PRVD
2017-04-142017-04
APUB
31/1317/RVD PDF file 261 kB
2017-04-212017-04
BPUB
2017-04-212017-04
PPUB
2017-05-222017-06
  

Abstract

IEC 60079-13:2017 gives requirements for the design, construction, assessment, verification and marking of rooms used to protect internal equipment:
– located in a Zone 1 or Zone 2 or Zone 21 or Zone 22 explosive atmosphere without an internal source of gas/vapour release and protected by pressurization;
– located in a Zone 2 explosive atmosphere with or without an internal source of gas/vapour release and protected by artificial ventilation;
– located in a non-hazardous area, containing an internal source of gas/vapour release and protected by artificial ventilation;
– located in a Zone 1 or Zone 2 or Zone 21 or Zone 22 explosive atmosphere containing an internal source of gas/vapour release and protected by both pressurization and artificial ventilation.
The term "room" used in this document includes single rooms, multiple rooms, a complete building or a room contained within a building. A room is intended to facilitate the entry of personnel and includes inlet and outlet ducts. An acoustic hood and other like enclosures designed to permit the entry of personnel can be considered as a room.
This document also includes requirements related safety devices and controls necessary to ensure that artificial ventilation, purging and pressurization is established and maintained.
A room assembled or constructed on site, can be either on land or off-shore. The room is primarily intended for installation by an end-user but could be constructed and assessed at a manufacturer’s facility, where the final construction such as ducting can be completed on site.
This document does not specify the methods that may be required to ensure adequate air quality for personnel with regard to toxicity and temperature within the room. National or other regulations and requirements may  exist to ensure the safety of personnel in this regard.
This second edition cancels and replaces the first edition published in 2010. This edition constitutes a technical revision.
This edition includes the following significant technical changes with respect to the previous edition:
a) modification of the title of this document to include artificially ventilated room "v" in addition to pressurized room "p";
b) addition of types of protection "pb", "pc", and "vc" and removal of types of protection "px", "py", "pz" and "pv";
c) definition of the differences between pressurization and artificial ventilation types of protection;
d) removal of protection of rooms with an inert gas or a flammable gas from the scope of this document;
e) addition of an informative annex to include examples of applications where types of protection pressurization or artificial ventilation or pressurization and artificial ventilation can be used and associated guidelines.

Project

IEC 60079-13:2017 ED2

Explosive atmospheres - Part 13: Equipment protection by pressurized room "p" and artificially ventilated room "v"

 

 

Associated Documents:

SMB/5800/DL

PDF file 458 kB