TC 4

Hydraulic turbines

 

Detail

Committee
Working Groups
Project Leader

Current

Status

Frcst Pub

Date

Stability

Date

TC 4 PPUB 2020

History

Stage
Document
Downloads
Decision Date
Target Date
PPUB
1976-01-01 
 2018-10

Abstract

Establishes suitable procedures for commissioning, operating and maintaining hydraulic turbines and associated equipment. Applies to impulse and reaction turbines of all types, and especially to large turbines directly coupled to electric generators. Also applies to pump-turbines when operating as turbines, and water conduits, gates, valves, drainage pumps, cooling-water equipment, generators, etc., where they cannot be separated from the turbine and its equipment.

Project

IEC 60545:1976 ED1

Guide for commissioning, operation and maintenance of hydraulic turbines

 

 

Associated Documents:

4/365/RR

PDF file 91 kB
4/320/RM

PDF file 1044 kB
4/297/RM

PDF file 240 kB
4/280/RM

PDF file 321 kB
4/271/Q

Word file 55 kB
PDF file 26 kB
SMB/3737/R

PDF file 179 kB
SMB/3231/R

PDF file 243 kB