SC 34D

Luminaires

 

Detail

Committee
Working Groups
Project Leader

Current

Status

Frcst Pub

Date

Stability

Date

SC 34D M. SimpsonPPUB2014-122020

History

Stage
Document
Downloads
Decision Date
Target Date
PNW
34D/996/NP PDF file 107 kB
2011-02-11 
ANW
34D/1022/RVN PDF file 80 kB
2011-06-032011-06
ANW
34D/1022A/RVN PDF file 185 kB
2011-06-032011-06
1CD
34D/1055/CD PDF file 182 kB
2012-04-132012-05
CDM
34D/1068/CC Word file 151 kB
PDF file 130 kB
2012-06-292012-08
ACDV
34D/1068A/CC Word file 155 kB
PDF file 228 kB
2012-12-072012-11
CCDV
34D/1093/CDV
PDF file 300 kB
PDF file 321 kB
2013-05-292013-03
AFDIS
34D/1105A/RVC Word file 308 kB
PDF file 326 kB
2013-10-102013-11
DECFDIS
2014-06-062014-06
RFDIS
2014-06-172014-06
CFDIS
34D/1147/FDIS

2014-09-052014-09
APUB
34D/1155/RVD PDF file 139 kB
2014-11-142014-11
BPUB
2014-11-172014-11
PPUB
2014-11-252014-12
 2020-04

Abstract

IEC 62722-2-1:2014 specifies the performance requirements for LED luminaires, together with the test methods and conditions, required to show compliance with this standard. It applies to LED luminaires for general lighting purposes. This first edition of IEC 62722-2-1 cancels and replaces IEC PAS 62722-2-1. published in 2011. This edition constitutes a technical revision. This edition includes the following significant technical changes with respect to the Publicly Available Specification.
a) The testing time is aligned with IEC 62717 and the option of 2 000 h is removed. Products containing modules not in compliance with IEC 62717 are now tested to 6 000 h.
b) Testing sample sizes have been modified to give valid statistical data.
c) The temperature reduction of 10 °C for street lanterns and floodlights has been removed.
d) Life definitions have been updated and aligned with IEC 62717.

Project

IEC 62722-2-1:2014 ED1

Luminaire performance - Part 2-1: Particular requirements for LED luminaires

 

 

Associated Documents:

34D/1523/RR

PDF file 24 kB