TC 114

Marine energy - Wave, tidal and other water current converters

 

Detail

Committee
Working Groups
Project Leader

Current

Status

Frcst Pub

Date

Stability

Date

TC 114PT 62600-103Mr Brian HolmesPPUB2018-072022

History

Stage
Document
Downloads
Decision Date
Target Date
PNW
114/92/NP PDF file 3105 kB
2012-03-23 
ANW
114/99/RVN PDF file 176 kB
2012-09-142012-08
ACD
2012-09-152012-09
CD
114/206/CD PDF file 1273 kB
2016-12-162016-10
PCC
2017-02-102017-02
ADTS
114/215/CC PDF file 502 kB
Word file 269 kB
2017-03-312017-07
ADTS
114/215A/CC PDF file 579 kB
Word file 269 kB
2017-03-312017-07
TDTS
2017-08-112017-09
CDTS
114/233/DTS
2017-08-112017-09
PRVDTS
2017-11-032017-11
APUB
114/259/RVDTS PDF file 335 kB
Word file 150 kB
2018-03-022018-10
APUB
114/259A/RVDTS PDF file 348 kB
Word file 159 kB
2018-03-022018-10
TPUB
2018-04-162018-04
DECPUB
2018-04-232018-06
RPUB
2018-05-162018-05
BPUB
2018-06-112018-08
PPUB
2018-07-192018-07
 2021-09

Abstract

IEC TS 62600-103:2018(E) is concerned with the sub-prototype scale development of wave energy converters. It includes the wave tank test programmes, where wave conditions are controlled so they can be scheduled, and the first large-scale sea trials, where sea states occur naturally and the programmes are adjusted and flexible to accommodate the conditions. This document describes the minimum test programmes that form the basis of a structured technology development schedule. For each testing campaign, the prerequisites, goals and minimum test plans are specified.

Project

IEC TS 62600-103:2018 ED1

Marine energy - Wave, tidal and other water current converters - Part 103: Guidelines for the early stage development of wave energy converters - Best practices and recommended procedures for the testing of pre-prototype devices

 

 

Associated Documents:

114/397/RR

PDF file 91 kB
SMB/5617/DL

PDF file 449 kB