TC 4 |
Hydraulic turbines |

Label |
Title |
---|---|
Working Group | |
WG 14 | Hydroelectric Power Plant Automation and Turbine Governing Systems |
WG 18 | Scale effects |
WG 25 | Acceptance tests for small hydraulic turbines |
WG 29 | Particle Erosion |
WG 30 | Guide for Installation procedures of hydropower machines |
WG 33 | Preparation of IEC 62882/Ed1 |
WG 35 | Hydraulic turbines - Scale Effects to Pelton type |
WG 36 | Calculation of hydraulic transients in hydropower turbine-generator units |
WG 37 | Standardized technical specifications governing fatigue of hydraulic turbine runners: from design to quality assurance |
WG 38 | Mechanical vibration - Measurement and evaluation of machine vibration |
Maintenance Teams | |
MT 28 | Revision of IEC 60041 Field acceptance tests to determine the hydraulic performance of hydraulic turbines, storage pumps and pump-turbines |
MT 31 | Turbine components life assessment |
MT 32 | Revision of IEC 60193 |
MT 34 | Joining and updating of publications IEC 60545 and 60805 |
MT 39 | Revision of IEC 60609-1 and IEC 60609-2 |
Country | Country Code | P/O Status | IEC Membership |
---|---|---|---|
AT | P-Member | Full Member | |
BE | P-Member | Full Member | |
CA | P-Member | Full Member | |
CN | P-Member | Full Member | |
CZ | P-Member | Full Member | |
EG | O-Member | Full Member | |
FI | O-Member | Full Member | |
FR | P-Member | Full Member | |
DE | P-Member | Full Member | |
GR | O-Member | Full Member | |
HU | O-Member | Full Member | |
IN | P-Member | Full Member | |
ID | O-Member | Full Member | |
IR | O-Member | Full Member | |
IE | O-Member | Full Member | |
IL | O-Member | Full Member | |
IT | P-Member | Full Member | |
JP | P-Member | Full Member | |
KR | O-Member | Full Member | |
MY | O-Member | Full Member | |
MX | O-Member | Full Member | |
NL | O-Member | Full Member | |
NZ | O-Member | Full Member | |
NO | P-Member | Full Member | |
PL | O-Member | Full Member | |
RO | O-Member | Full Member | |
RU | P-Member | Full Member | |
RS | O-Member | Full Member | |
SI | P-Member | Full Member | |
ES | O-Member | Full Member | |
SE | P-Member | Full Member | |
CH | P-Member | Full Member | |
UA | O-Member | Full Member | |
GB | P-Member | Full Member | |
US | P-Member | Full Member |
Facts and figures
Secretariat | Canada |
---|---|
Participating countries | 17 |
Observer Countries | 18 |
Chair | Mr Pierre Maruzewski (FR) Term of office : 2026-11 | |
---|---|---|
Secretary | Mrs Christine J Geraghty (CA) | |
Assistant Secretary | Ms Ester Williams (CA) |
IEC Central Office Contacts
Technical Officer | Mr Timothy J Rotti | |
---|---|---|
Standards Project Administrator | Ms Marlene Maillet | |
Editor | Ms Mélanie Ardiri |
Log in for contact details
Full contact details are available to authorized users after log in.

Committee |
Description |
Incoming liaison representative |
Outgoing liaison representative |
---|---|---|---|
Internal IEC Liaison | |||
TC 57 | Power systems management and associated information exchange | Mr Erik Wejander |
|
TC 114 | Marine energy - Wave, tidal and other water current converters | ||
Liaison ISO | |||
ISO/TC 30 | Measurement of fluid flow in closed conduits | ||
ISO/TC 108 | Mechanical vibration, shock and condition monitoring | ||
ISO/TC 108/SC 2 | Measurement and evaluation of mechanical vibration and shock as applied to machines, vehicles and structures | Mr Andrew Hubbard Mr Felix Schwaericke |
|
ISO/TC 113 | Hydrometry | ||
Liaison A | |||
CIGRE/SC A2 | International council on large electric systems - Transformers | ||
IAPWS | The International Association for the Properties of Water and Steam |
Working Groups
|
Description
|
Organization
|
Incoming liaison representative
|
Outgoing liaison representative
|
---|---|---|---|---|
Liaison C | ||||
WG 14 |
Hydroelectric Power Plant Automation and Turbine Governing Systems
|
IEEE/PES/EDPG |
