International Standards and Conformity Assessment for all electrical, electronic and related technologies

SC 22H

Uninterruptible power systems (UPS)

 
export to xls file

SC 22H Work programme (4)

Project

Reference

Document

Reference

Init.

Date

Current

Stage

Next

Stage

Working

Group

Project

Leader

Fcst. Publ.

Date

PNW 22H-249

Power Converter Sub-System (PCSS) for use in Electrical Energy Storage Systems ( EESS) - Method of specifying the performance and test requirements

22H/249/NP PRVN
  • PRVN
  • Preparation of RVN

2019-09

2019-10

Denis Finck 2023-12
IEC 62040-3 ED3

Uninterruptible power systems (UPS) - Part 3: Method of specifying the performance and test requirements

22H/245/CD 2017-03 ACDV
  • ACDV
  • Approved for CDV

2019-10

TCDV
  • TCDV
  • Translation of CDV

2019-12

MT 62040-3 Per Grandjean-Thomsen 2020-10
IEC 62040-5-1 ED1

Uninterruptible power systems (UPS) - Part 5-1: DC output UPS - Safety requirements

22H/229/CD 2016-07 ACD
  • ACD
  • Approved for CD

2018-04

2CD
  • 2CD

2019-12

WG 7 Keith Goshia 2020-10
IEC 62310-1 ED2

Static transfer systems (STS) - Part 1: General and safety requirements

22H/240/RR 2018-10 ACD
  • ACD
  • Approved for CD

2018-10

CD
  • CD
  • Draft circulated as CD

2019-06

MT 62310-1 Christopher Belcastro 2021-06