TC 57 Work programme (46)

Project

Reference

Document

Reference

Init.

Date

Current

Stage

Next

Stage

Working

Group

Project

Leader

Fcst. Publ.

Date

PWI TR 57-1001

Development of IEC TR 61850-6-100, SCL Function Modelling for Substation Automation

PWI
  • PWI
  • Preliminary Work Item

2017-08

2017-12

PWI TR 57-1003

IEC TR 61850-90-22, SCD based substation network auto-routing with visualization and supervision support

PWI
  • PWI
  • Preliminary Work Item

2018-06

2019-06

PNW TS 57-2235

IIoT applications in power distribution systems management: Architecture and functional requirements

57/2235/NP PRVN
  • PRVN
  • Preparation of RVN document

2020-09

2020-10

Shen Guo 2023-12
PNW TS 57-2264

Developing a profile composed of a set of Basic Application Profiles (BAPs) of IEC 61850 for DER compliant to IEEE 1547

57/2264/NP PNW
  • PNW
  • New Work Item Proposal

2020-08

PRVN
  • PRVN
  • Preparation of RVN document

2020-11

WG 17 Alexander Apostolov 2024-10
IEC 61850-4/AMD1 ED2

Amendment 1 - Communication networks and systems for power utility automation - Part 4: System and project management

57/2256/FDIS

2017-08 BPUB
  • BPUB
  • Being published

2020-09

PPUB
  • PPUB
  • Publication published

2020-11

WG 10 Christoph Brunner 2020-11
IEC 61850-5/AMD1 ED2

Amendment 1 - Communication networks and systems for power utility automation - Part 5: Communication requirements for functions and device models

57/2215/CDV 2019-01 PRVC
  • PRVC
  • Preparation of RVC

2020-08

2020-11

WG 10 Christoph Brunner 2021-07
IEC 61850-6-2 ED1

Communication networks and systems for power utility automation - Part 6-2: Configuration description language for extensions for human machine interfaces

57/2226/CD 2017-03 ACD
  • ACD
  • Approved for CD

2020-10

3CD
  • 3CD

2021-03

WG 10 Dustin Tessier 2021-12
IEC TR 61850-7-5 ED1

Communication networks and systems for power utility automation – Part 7-5: IEC 61850 modelling concepts

57/2253/DTR

2020-07 PRVDTR
  • PRVDTR
  • Preparation of RVDTR document

2020-09

2020-12

WG 10 2021-05
IEC 61850-7-410 ED3

Communication networks and systems for power utility automation - Part 7-410: Basic communication structure - Hydroelectric power plants - Communication for monitoring and control

57/2263/RR 2020-08 ACD
  • ACD
  • Approved for CD

2020-08

CD
  • CD
  • Draft circulated as CD

2021-05

WG 18 Erik Wejander 2022-09
IEC 61850-7-420 ED2

Communication networks and systems for power utility automation - Part 7-420: Basic communication structure - Distributed energy resources and distribution automation logical nodes

57/2187/CDV 2012-11 PRVC
  • PRVC
  • Preparation of RVC

2020-06

2020-09

WG 17 Frances M. Cleveland 2021-09
IEC TR 61850-7-510 ED2

Communication networks and systems for power utility automation - Part 7-510: Basic communication structure - Hydroelectric power plants - Modelling concepts and guidelines

57/2276/RR 2020-10 ACD
  • ACD
  • Approved for Committee Draft

2020-10

CD
  • CD
  • Draft circulated as CD

2020-10

WG 18 Erik Wejander 2021-12
IEC TR 61850-10-3 ED1

Communication networks and systems for power utility automation - Part 10-3: Functional testing of IEC 61850 systems

57/2199/DTR

2020-03 PRVDTR
  • PRVDTR
  • Preparation of RVDTR document

2020-05

2020-08

2021-04
IEC TS 61850-80-5 ED1

Communication networks and systems for power utility automation - Part 80-5: Guideline for mapping information between IEC 61850 and IEC 61158-6 (Modbus)

57/2250/CD 2014-05 PCC
  • PCC
  • Preparation of CC document

2020-09

2020-10

WG 10 Joel Greene 2021-10
IEC TR 61850-90-13

Communication networks and systems for power utility automation - Part 90-13: Deterministic networking technologies

57/2236/DTR

2020-06 PRVDTR
  • PRVDTR
  • Preparation of RVDTR document

2020-08

2020-11

2021-04
IEC TR 61850-90-14 ED1

Communication networks and systems for power utility automation – Part 90-14: Using IEC 61850 for FACTS (Flexible AC Transmission Systems), HVDC (High Voltage Direct Current) Transmission and Power Conversion data modelling

57/2232/DTR


2020-06 APUB
  • APUB
  • Approved for publication

2020-10

TPUB
  • TPUB
  • Translation of publication

2020-12

WG 10 2021-04
IEC TS 61850-90-16 ED1

Communication networks and systems for power utility automation - Part 90-16: System management for IEC 61850

57/1775/NP 2017-01 ACD
  • ACD
  • Approved for CD

2017-01

CD
  • CD
  • Draft circulated as CD

2019-10

WG 10 Thierry Coste 2021-10
IEC TR 61850-90-19 ED1

Communication networks and systems for power utility automation - Part 90-19: Using Role Based Access Control (RBAC) and IEC 61850

PWI
  • PWI
  • Preliminary Work Item

2016-12

WG 10
PWI 61850-90-20 ED1

Communication networks and systems for power utility automation - Part 90-20: Guideline to redundancy systems

PWI
  • PWI
  • Preliminary Work Item

2016-11

CDTR
  • CDTR
  • Circulation of DTR

2017-12

WG 10
IEC 61968-3 ED3

Application integration at electric utilities - System interfaces for distribution management - Part 3: Interface for network operations

57/2242/CDV 2020-06 CCDV
  • CCDV
  • Draft circulated as CDV

2020-08

PRVC
  • PRVC
  • Preparation of RVC

2020-11

WG 14 Martin Bass 2021-10
IEC 61968-9 ED3

Application integration at electric utilities - System interfaces for distribution management - Part 9: Interfaces for meter reading and control

57/2245/CD 2016-11 PCC
  • PCC
  • Preparation of CC

2020-09

2020-10

WG 14 David Bishop 2022-01
IEC 61968-13 ED2

Application integration at electric utilities - System interfaces for distribution management - Part 13: Common distribution power system model profiles

57/2119/CDV 2015-03 RFDIS
  • RFDIS
  • FDIS received and registered

2020-07

CFDIS
  • CFDIS
  • Draft circulated as FDIS

2020-09

WG 13 Eric Lambert 2021-03
IEC 61970-303 ED1

Energy Management System Application Program Interface (EMS-API) - Part 303: Common information model (CIM), Network Model Management

57/1958/NP 2018-07 ACD
  • ACD
  • Approved for CD

2018-07

CD
  • CD
  • Draft circulated as CD

2019-10

WG 13 Arsim Bytyqi 2021-12
IEC 61970-401 ED1

Energy management system application program interface (EMS-API) - Part 401: Profile framework

57/2265/CDV 2018-02 CCDV
  • CCDV
  • Draft circulated as CDV

2020-10

PRVC
  • PRVC
  • Preparation of RVC

2021-01

WG 13 Lars-Ola Österlund 2021-11
IEC 61970-452 ED4

Energy management system application program interface (EMS-API) - Part 452: CIM static transmission network model profiles

57/2261/CDV 2019-03 CCDV
  • CCDV
  • Draft circulated as CDV

2020-10

PRVC
  • PRVC
  • Preparation of RVC

2020-12

WG 13 Kurt Hunter 2021-11
IEC 61970-457 ED1

Energy Management System Application Program Interface (EMS-API) – Part 457: Dynamics profile

57/2229/CDV 2020-05 PRVC
  • PRVC
  • Preparation of RVC

2020-10

2021-01

WG 13 Chavdar Ivanov 2021-07
IEC 61970-459 ED1

Energy Management System Application Program Interface (EMS-API) - Part 459: Framework for managing shared network model information

57/1959/NP 2018-07 ACD
  • ACD
  • Approved for CD

2018-07

CD
  • CD
  • Draft circulated as CD

2019-10

WG 13 Arsim Bytyqi 2021-12
IEC 61970-460 ED1

Energy Management System Application Program Interface (EMS-API) – Part 460: Profiles for projects that describe changes to IEC 61970 network models

57/1953/NP 2018-04 ACD
  • ACD
  • Approved for CD

2018-04

CD
  • CD
  • Draft circulated as CD

2019-02

WG 13 Jay Britton 2021-10
IEC 61970-501 ED2

Energy management system application program interface (EMS-API) - Part 501: Common Information Model Resource Description Framework (CIM RDF) schema

57/1965A/RR 2018-02 ACD
  • ACD
  • Approved for CD

2019-08

2019-10

WG 13 Svein Olsen 2021-11
IEC 61970-600-1 ED1

Energy management system application program interface (EMS-API) - Part 600-1: Common Grid Model Exchange Specification (CGMES) - Structure and rules

57/2169/CDV 2018-09 PRVC
  • PRVC
  • Preparation of RVC

2020-04

2020-07

WG 13 Olivier AINE 2021-08
IEC 61970-600-2 ED1

Energy management system application program interface (EMS-API) - Part 600-2: Common Grid Model Exchange Specification (CGMES) - Exchange profiles specification

57/2170/CDV 2018-09 PRVC
  • PRVC
  • Preparation of RVC

2020-04

2020-07

WG 13 Olivier AINE 2021-08
IEC 62325-451-7 ED1

Framework for energy market communications - Part 451-7: Balancing processes, contextual and assembly models for European style market

57/2196/CDV 2019-05 AFDIS
  • AFDIS
  • Approved for FDIS

2020-08

DECFDIS
  • DECFDIS
  • FDIS at Editing Check

2020-10

WG 16 Greta BONNARY 2021-04
IEC 62325-451-8 ED1

Framework for energy market communications - Part 451-8: HVDC processes, contextual and assembly models for European style market

57/2220/CD 2019-11 ACDV
  • ACDV
  • Approved for CDV

2020-09

TCDV
  • TCDV
  • Translation of CDV

2020-12

WG 16 Greta BONNARY 2022-04
IEC 62325-451-10 ED1

Framework for energy market communications - Part 451-10: Profiles for energy consumption data (“My Energy Data”)

57/2266/FDIS

2017-10 PRVD
  • PRVD
  • Preparation of RVD

2020-10

2020-10

WG 16 Eric Lambert 2020-12
PWI 62325-452-1 ED1

Day Ahead Market

PWI
  • PWI
  • Preliminary Work Item

2013-10

prePNW
  • prePNW
  • Preparation of NP document

WG 16
PWI 62325-452-4 ED1

Weather data to support market operations

PWI
  • PWI
  • Preliminary Work Item

2013-10

prePNW
  • prePNW
  • Preparation of NP document

WG 16
PWI 62325-452-5 ED1

Communications with Demand Response Systems

PWI
  • PWI
  • Preliminary Work Item

2013-10

prePNW
  • prePNW
  • Preparation of NP document

WG 16
PWI 62325-550-2 ED1

Common Dynamic Data Structures for DAM, RT, FTR

PWI
  • PWI
  • Preliminary Work Item

2013-10

prePNW
  • prePNW
  • Preparation of NP document

WG 16
PWI 62325-552-1 ED1

Dynamic Data Structures for DAM

PWI
  • PWI
  • Preliminary Work Item

2013-10

prePNW
  • prePNW
  • Preparation of NP document

WG 16
IEC 62351-5 ED1

Power systems management and associated information exchange - Data and communications security - Part 5: Security for IEC 60870-5 and derivatives

57/2244/CD 2019-07 PCC
  • PCC
  • Preparation of CC

2020-09

2020-10

WG 15 Marco Grechi 2022-04
IEC 62351-9 ED2

Power systems management and associated information exchange - Data and communications security - Part 9: Cyber security key management for power system equipment

57/2214/RR 2020-04 ACD
  • ACD
  • Approved for CD

2020-04

CD
  • CD
  • Draft circulated as CD

2020-12

WG 15 Steffen Fries 2022-08
IEC 62351-14 ED1

Power systems management and associated information exchange - Data and communications security - Part 14: Cyber security event logging

57/2162/CD 2016-12 PCC
  • PCC
  • Preparation of CC

2020-01

2020-02

WG 15 Arijit Bose 2022-01
IEC TR 62351-90-3 ED1

Power systems management and associated information exchange - Data and communications security - Part 90-3: Guidelines for network and system management

57/2255/DTR

2020-08 PRVDTR
  • PRVDTR
  • Preparation of RVDTR document

2020-10

2020-12

2021-06
IEC TS 62351-100-4 ED1

Power systems management and associated information exchange – Data and communication security – Part 100-4: Conformance testing for IEC 62351-4

57/2007/NP 2018-10 ACD
  • ACD
  • Approved for CD

2018-10

CD
  • CD
  • Draft circulated as CD

2019-12

WG 15 Marc Lacroix 2021-10
IEC TS 62351-100-6 ED1

Power systems management and associated information exchange – Data and communications security – Part 100-6: Conformance testing for IEC 62351-6

57/2006/NP 2018-10 ACD
  • ACD
  • Approved for CD

2018-10

CD
  • CD
  • Draft circulated as CD

2019-12

WG 15 Marc Lacroix 2021-10
IEC 62488-3 ED1

Power line communication systems for power utility applications - Part 3: Digital Power Line Carrier (DPLC) terminals and hybrid ADPLC terminals

57/2095/CDV 2018-05 RFDIS
  • RFDIS
  • FDIS received and registered

2020-10

CFDIS
  • CFDIS
  • Draft circulated as FDIS

2021-01

WG 20 John Newbury 2021-04
PWI 62488-4 ED1

Broadband systems operating over EHV/HV/MV/LV electricity grids

PWI
  • PWI
  • Preliminary Work Item

2013-10

prePNW
  • prePNW
  • Preparation of NP document

WG 20