TC 99

Insulation co-ordination and system engineering of high voltage electrical power installations above 1,0 kV AC and 1,5 kV DC

 
export to xls file

TC 99 Work programme (4)

Project

Reference

Document

Reference

Init.

Date

Current

Stage

Next

Stage

Working

Group

Project

Leader

Fcst. Publ.

Date

PNW TS 99-230

Power installations exceeding 1 kV a.c. and 1,5 kV d.c – Part 0: Principles to be observed in preparation of safety publications - high voltage installations

99/230/NP PRVN
  • PRVN
  • Preparation of RVN document

2019-07

2019-08

Espen Masvik 2022-06
IEC 60071-2 ED5

Insulation co-ordination - Part 2: Application guidelines (Proposed horizontal standard)

99/224/RR 2018-11 ACD
  • ACD
  • Approved for CD

2018-11

CD
  • CD
  • Draft circulated as CD

2019-11

MT 9 Eiichi Zaima 2021-11
IEC 61936-1 ED3

Power installations exceeding 1 kV AC and 1,5 kV DC - Part 1: AC

99/226A/CD 2019-01 CDM
  • CDM
  • CD to be discussed at meeting

2019-05

2019-07

MT 4 Lars Hansson 2020-12
IEC 61936-2 ED1

Power installations exceeding 1 kV a.c. and 1,5 kV d.c. - Part 2: d.c.

99/168/RR 2017-06 ACD
  • ACD
  • Approved for CD

2017-06

CD
  • CD
  • Draft circulated as CD

2019-10

JMT 7 Leslie Brand 2020-08