International Standards and Conformity Assessment for all electrical, electronic and related technologies

TC 34

Lamps and related equipment

 
export to xls file

TC 34 Work programme (19)

Project

Reference

Document

Reference

Init.

Date

Current

Stage

Next

Stage

Working

Group

Project

Leader

Fcst. Publ.

Date

PWI TR 34-1 ED1

Connectivity for Lighting Systems - Interoperability (functional), communication protocol and connectivity of lighting systems and/or connecting to total control systems

PWI
  • PWI
  • Preliminary Work Item

2017-12

2020-12

WG 14 JEUNG MO KANG
PWI 34-2 ED1

Intelligent lighting products for lighting systems

PWI
  • PWI
  • Preliminary Work Item

2017-12

prePNW
  • prePNW
  • Preparation of NP document

2020-12

WG 14 JEUNG MO KANG
PWI 34-3 ED1

Interface between luminaires and independent control devices for lighting systems

PWI
  • PWI
  • Preliminary Work Item

2018-10

prePNW
  • prePNW
  • Preparation of NP document

2020-12

WG 14 Keum Lee
PNW 34-639

Digital addressable lighting interface – Part 150: Auxiliary Power Supply

34/639/NP PRVN
  • PRVN
  • Preparation of RVN

2019-11

2019-12

WG 11 Scott Wade 2022-09
PNW 34-640

Digital addressable lighting interface – Part 250: Particular requirements for control gear – Integrated Bus Power Supply (device Type 49)

34/640/NP PRVN
  • PRVN
  • Preparation of RVN

2019-11

2019-12

WG 11 Scott Wade 2022-09
PNW 34-641

Digital addressable lighting interface – Part 251: Particular requirements for control gear – Memory bank 1 extension (Device Type 50)

34/641/NP PRVN
  • PRVN
  • Preparation of RVN

2019-11

2019-12

WG 11 Scott Wade 2022-09
PNW 34-642

Digital addressable lighting interface – Part 252: Particular requirements for control gear – Energy Reporting (Device Type 51)

34/642/NP PRVN
  • PRVN
  • Preparation of RVN

2019-11

2019-12

WG 11 Scott Wade 2022-09
PNW 34-643

Digital addressable lighting interface – Part 253: Particular requirements for control gear – Diagnostics and maintenance (Device Type 52)

34/643/NP PRVN
  • PRVN
  • Preparation of RVN

2019-11

2019-12

WG 11 Scott Wade 2022-09
IEC 61547 ED3

Equipment for general lighting purposes - EMC immunity requirements

34/589/CDV 2017-11 RFDIS
  • RFDIS
  • FDIS received and registered

2019-11

CFDIS
  • CFDIS
  • Draft circulated as FDIS

2020-02

WG 5 Norbert Wittig 2020-05
IEC TR 61547-1 ED3

Equipment for general lighting purposes - EMC immunity requirements - Part 1: An objective light flickermeter and voltage fluctuation immunity test method

34/603/CD 2019-03 ADTR
  • ADTR
  • Approved for DTR circulation

2019-07

TDTR
  • TDTR
  • Translation of DTR

2019-12

WG 5 Norbert Wittig 2020-10
IEC 62386-105 ED1

Digital addressable lighting interface – Part 105: Particular requirements for control gear and control devices – Firmware Transfer

34/590/CDV 2017-10 RFDIS
  • RFDIS
  • FDIS received and registered

2019-11

CFDIS
  • CFDIS
  • Draft circulated as FDIS

2020-02

WG 11 Norbert Wittig 2020-05
IEC 62386-202 ED2

Digital addressable lighting interface - Part 202: Particular requirements for control gear - Self-contained emergency lighting (device type 1)

34/530/CD 2018-05 ACD
  • ACD
  • Approved for CD

2018-09

2CD
  • 2CD

2020-03

WG 11 Norbert Wittig 2021-02
IEC 62386-305 ED1

Digital addressable lighting interface – Part 305: Particular requirements – Input devices – Colour sensor

34/608/NP 2019-07 ACD
  • ACD
  • Approved for CD

2019-07

CD
  • CD
  • Draft circulated as CD

2020-07

WG 11 Norbert Wittig 2021-07
IEC 62778 ED1

Assessment of blue light hazard of light sources and luminaires

34/607A/CD 2017-01 ACDV
  • ACDV
  • Approved for CDV

2019-06

TCDV
  • TCDV
  • Translation of CDV

2019-10

WG 6 Andreas Scholtz 2021-01
IEC 63103 ED1

Lighting equipment - Non-active mode power measurement

34/621/CDV 2016-12 PRVC
  • PRVC
  • Preparation of RVC

2019-11

2020-02

PT 63103 John Gielen 2020-10
IEC TS 63105 ED1

Lighting systems and related equipment - Vocabulary

34/580/CD 2016-12 ADTS
  • ADTS
  • Approved for DTS

2019-02

TDTS
  • TDTS
  • Translation of DTS

2019-08

WG 14 Andreas Scholtz 2020-12
IEC 63116 ED1

Lighting systems - General requirements

34/597/CD 2017-02 ACDV
  • ACDV
  • Approved for CDV

2019-08

TCDV
  • TCDV
  • Translation of CDV

2020-01

PT 63116 Wei zhang 2020-12
IEC 63117 ED1

General requirements for lighting systems - Safety

34/629/CD 2017-02 PCC
  • PCC
  • Preparation of CC

2019-10

2019-11

PT 63117 Wei zhang 2020-12
IEC 63129 ED1

Determination of inrush current characteristics of lighting products

34/636/CDV 2017-04 CCDV
  • CCDV
  • Draft circulated as CDV

2019-10

PRVC
  • PRVC
  • Preparation of RVC

2020-01

WG 5 Norbert Wittig 2020-11