TC 57 Work programme (62)

Project

Reference

Document

Reference

Init.

Date

Current

Stage

Next

Stage

Working

Group

Project

Leader

Fcst. Publ.

Date

PWI TR 57-1000 ED

IEC TR 61850-90-13, Deterministic networking technologies

PWI
  • PWI
  • Preliminary Work Item

2017-03

prePNW
  • prePNW
  • Preparation of NP document

2018-03

PWI TR 57-1001

Development of IEC TR 61850-6-100, SCL Function Modelling for Substation Automation

PWI
  • PWI
  • Preliminary Work Item

2017-08

2017-12

PWI TR 57-1002

IEC TR 61850-10-3, Functional testing of IEC 61850 based systems

PWI
  • PWI
  • Preliminary Work Item

2017-09

2018-06

PWI TR 57-1003

IEC TR 61850-90-22, SCD based substation network auto-routing with visualization and supervision support

PWI
  • PWI
  • Preliminary Work Item

2018-06

2019-06

PNW 57-2094 ED1

Energy Management System Application Program Interface (EMS-API) – Part 457: Dynamics profile

57/2094/NP PRVN
  • PRVN
  • Preparation of RVN

2019-07

2019-08

WG 13 Chuck Dubose 2020-08
IEC TS 61850-1-2 ED1

Communication networks and systems for power utility automation - Part 1-2: Guideline on extending IEC 61850

57/2084/DTS

2017-04 RPUB
  • RPUB
  • Publication received and registered

2019-11

BPUB
  • BPUB
  • Publication being printed

2020-02

WG 10 Laurent Guise 2020-02
IEC 61850-4/AMD1 ED2

Amendment 1 - Communication networks and systems for power utility automation - Part 4: System and project management

57/1922/CDV 2017-08 AFDIS
  • AFDIS
  • Approved for FDIS

2018-07

TFDIS
  • TFDIS
  • Translation of FDIS

2019-12

WG 10 Christoph Brunner 2020-07
IEC 61850-5/AMD1 ED2

Amendment 1 - Communication networks and systems for power utility automation - Part 5: Communication requirements for functions and device models

57/2076/CDV
2019-01 PRVC
  • PRVC
  • Preparation of RVC

2019-06

2019-09

WG 10 Christoph Brunner 2020-09
IEC 61850-6-2 ED1

Communication networks and systems for power utility automation - Part 6-2: Configuration description language for extensions for human machine interfaces

57/1984/CD 2017-03 ACD
  • ACD
  • Approved for CD

2018-06

2CD
  • 2CD

2019-03

WG 10 Dustin Tessier 2020-12
IEC 61850-7-1/AMD1 ED2

Amendment 1 - Communication networks and systems for power utility automation - Part 7-1: Basic communication structure - Principles and models

57/2035/CDV 2018-08 TFDIS
  • TFDIS
  • Translation of FDIS

2019-11

DECFDIS
  • DECFDIS
  • FDIS at Editing Check

2019-12

WG 10 Christoph Brunner 2020-07
IEC 61850-7-2/AMD1 ED2

Amendment 1 - Communication networks and systems for power utility automation - Part 7-2: Basic information and communication structure - Abstract communication service interface (ACSI)

57/2100/FDIS



2016-04 BPUB
  • BPUB
  • Being published

2019-08

PPUB
  • PPUB
  • Publication published

2019-09

WG 10 Christoph Brunner 2019-11
IEC 61850-7-3/AMD1 ED2

Amendment 1 - Communication networks and systems for power utility automation - Part 7-3: Basic communication structure - Common data classes

57/2101/FDIS



2016-04 BPUB
  • BPUB
  • Being published

2019-08

PPUB
  • PPUB
  • Publication published

2019-09

WG 10 Christoph Brunner 2019-11
IEC 61850-7-4/AMD1 ED2

Amendment 1 - Communication networks and systems for power utility automation - Part 7-4: Basic communication structure - Compatible logical node classes and data object classes

57/2102A/FDIS 2015-10 BPUB
  • BPUB
  • Being published

2019-08

PPUB
  • PPUB
  • Publication published

2019-09

WG 10 Christoph Brunner 2019-11
PWI 61850-7-5 ED1

IEC 61850 modeling concepts

PWI
  • PWI
  • Preliminary Work Item

2013-10

prePNW
  • prePNW
  • Preparation of NP document

WG 10
IEC 61850-7-420 ED2

Communication networks and systems for power utility automation - Part 7-420: Basic communication structure - Distributed energy resources and distribution automation logical nodes

57/1997/CD 2012-11 PCC
  • PCC
  • Preparation of CC

2018-08

2018-09

WG 17 Frances M. Cleveland 2020-11
IEC 61850-8-1/AMD1 ED2

Amendment 1 - Communication networks and systems for power utility automation - Part 8-1: Specific communication service mapping (SCSM) - Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3

57/2150/FDIS 2017-01 CFDIS
  • CFDIS
  • Draft circulated as FDIS

2019-10

PRVD
  • PRVD
  • Preparation of RVD document

2019-11

WG 10 Christoph Brunner 2020-01
IEC 61850-9-2/AMD1 ED2

Amendment 1 - Communication networks and systems for power utility automation - Part 9-2: Specific communication service mapping (SCSM) - Sampled values over ISO/IEC 8802-3

57/2112/FDIS


2016-03 BPUB
  • BPUB
  • Being published

2019-08

PPUB
  • PPUB
  • Publication published

2019-10

WG 10 Christoph Brunner 2019-11
IEC TS 61850-80-5 ED1

Communication networks and systems for power utility automation - Part 80-5: Guideline for mapping information between IEC 61850 and IEC 61158-6 (Modbus)

57/1829/CD 2014-05 ACD
  • ACD
  • Approved for CD

2019-02

2CD
  • 2CD

2019-11

WG 10 Joel Greene 2020-11
IEC TR 61850-90-4 ED2

Communication networks and systems for power utility automation - Part 90-4: Network engineering guidelines

57/2088/DTR


2019-03 APUB
  • APUB
  • Approved for publication

2019-11

TPUB
  • TPUB
  • Translation of publication

2019-11

WG 10 Christoph Brunner 2020-04
PWI 61850-90-8 ED1

IEC 61850 object models for electrical mobility

PWI
  • PWI
  • Preliminary Work Item

2013-10

prePNW
  • prePNW
  • Preparation of NP document

WG 17
IEC TR 61850-90-9 ED1

Communication networks and systems for power utility automation – Part 90-9: Use of IEC 61850 for Electrical Energy Storage Systems

57/2128/DTR


2019-08 PRVDTR
  • PRVDTR
  • Preparation of RVDTR document

2019-09

2019-12

WG 17 2020-05
IEC TR 61850-90-11 ED1

Communication networks and systems for power utility automation – Part 90-11: Methodologies for modelling of logics for IEC 61850 based applications

57/2129A/DTR 2019-08 PRVDTR
  • PRVDTR
  • Preparation of RVDTR document

2019-10

2020-01

WG 10 2020-06
IEC TR 61850-90-12 ED2

Communication networks and systems for power utility automation - Part 90-12: Wide area network engineering guidelines

57/2136/DTR

2018-08 PRVDTR
  • PRVDTR
  • Preparation of RVDTR document

2019-10

2020-01

WG 10 Yoshizumi Serizawa 2020-06
PWI 61850-90-14 ED1

Using IEC 61850 for FACTS data modeling

PWI
  • PWI
  • Preliminary Work Item

2013-10

prePNW
  • prePNW
  • Preparation of NP document

WG 10
PWI 61850-90-15 ED1

Hierarchical architecture of a DER system

PWI
  • PWI
  • Preliminary Work Item

2013-10

prePNW
  • prePNW
  • Preparation of NP document

WG 17
IEC TS 61850-90-16 ED1

Communication networks and systems for power utility automation - Part 90-16: System management for IEC 61850

57/1775/NP 2017-01 ACD
  • ACD
  • Approved for CD

2017-01

CD
  • CD
  • Draft circulated as CD

2019-10

WG 10 Thierry Coste 2020-11
IEC TR 61850-90-19 ED1

Communication networks and systems for power utility automation - Part 90-19: Using Role Based Access Control (RBAC) and IEC 61850

PWI
  • PWI
  • Preliminary Work Item

2016-12

WG 10
PWI 61850-90-20 ED1

Communication networks and systems for power utility automation - Part 90-20: Guideline to redundancy systems

PWI
  • PWI
  • Preliminary Work Item

2016-11

CDTR
  • CDTR
  • Circulation of DTR

2017-12

WG 10
PWI 61850-99-99 ED1

Communication network in hydropower plants

PWI
  • PWI
  • Preliminary Work Item

2013-10

prePNW
  • prePNW
  • Preparation of NP document

WG 18
IEC 61968-1 ED3

Application integration at electric utilities - System interfaces for distribution management - Part 1: Interface architecture and general recommendations

57/2043/CDV 2016-07 RFDIS
  • RFDIS
  • FDIS received and registered

2019-08

CFDIS
  • CFDIS
  • Draft circulated as FDIS

2019-11

WG 14 Shawn Hu 2020-02
IEC 61968-5 ED1

Application integration at electric utilities - System interfaces for distribution management – Part 5: Distributed energy optimization

57/1989A/CDV 2017-12 AFDIS
  • AFDIS
  • Approved for FDIS

2019-05

WG 14 Gerald Gray 2020-07
IEC 61968-9 ED3

Application integration at electric utilities - System interfaces for distribution management - Part 9: Interfaces for meter reading and control

57/1787/RR 2016-11 ACD
  • ACD
  • Approved for CD

2018-11

2019-02

WG 14 David Bishop 2021-01
IEC 61968-13 ED2

Application integration at electric utilities - System interfaces for distribution management - Part 13: Common distribution power system model profiles

57/2119/CDV 2015-03 CCDV
  • CCDV
  • Draft circulated as CDV

2019-08

PRVC
  • PRVC
  • Preparation of RVC

2019-11

WG 13 Eric Lambert 2020-11
IEC 61970-301 ED7

Energy management system application program interface (EMS-API) - Part 301: Common information model (CIM) base

57/2089/CDV 2018-02 PRVC
  • PRVC
  • Preparation of RVC

2019-08

2019-11

WG 13 Kurt Hunter 2020-10
IEC 61970-303 ED1

Energy Management System Application Program Interface (EMS-API) - Part 303: Common information model (CIM), Network Model Management

57/1958/NP 2018-07 ACD
  • ACD
  • Approved for CD

2018-07

CD
  • CD
  • Draft circulated as CD

2019-10

WG 13 Arsim Bytyqi 2020-12
IEC 61970-401 ED1

Energy management system application program interface (EMS-API) - Part 401: Component interface specification (CIS) framework

57/1974/RR 2018-02 ACD
  • ACD
  • Approved for CD

2018-02

CD
  • CD
  • Draft circulated as CD

2018-09

WG 13 Lars-Ola Österlund 2021-01
IEC 61970-452 ED4

Energy management system application program interface (EMS-API) - Part 452: CIM static transmission network model profiles

57/2086/RR 2019-03 ACDV
  • ACDV
  • Approved for CDV

2019-03

TCDV
  • TCDV
  • Translation of CDV

2019-04

WG 13 Kurt Hunter 2020-11
IEC 61970-458 ED1

Energy management system application program interface (EMS-API) - Part 458: Common information model (CIM) extension to generation

57/1114/NP 2012-01 PWI
  • PWI
  • Preliminary Work Item

2014-02

prePNW
  • prePNW
  • Preparation of NP document

WG 13 Jean-François Cabadi 2018-03
IEC 61970-459 ED1

Energy Management System Application Program Interface (EMS-API) - Part 459: Framework for managing shared network model information

57/1959/NP 2018-07 ACD
  • ACD
  • Approved for CD

2018-07

CD
  • CD
  • Draft circulated as CD

2019-10

WG 13 Arsim Bytyqi 2020-12
IEC 61970-460 ED1

Energy Management System Application Program Interface (EMS-API) – Part 460: Profiles for projects that describe changes to IEC 61970 network models

57/1953/NP 2018-04 ACD
  • ACD
  • Approved for CD

2018-04

CD
  • CD
  • Draft circulated as CD

2019-02

WG 13 Jay Britton 2021-02
IEC 61970-501 ED2

Energy management system application program interface (EMS-API) - Part 501: Common Information Model Resource Description Framework (CIM RDF) schema

57/1965A/RR 2018-02 ACD
  • ACD
  • Approved for CD

2019-08

2019-10

WG 13 Svein Olsen 2020-11
IEC 61970-600-1 ED1

Energy management system application program interface (EMS-API) - Part 600-1: Common Grid Model Exchange Specification (CGMES) - Structure and rules

57/2044/RR 2018-09 ACDV
  • ACDV
  • Approved for CDV

2019-09

2019-12

WG 13 Olivier AINE 2021-01
IEC 61970-600-2 ED1

Energy management system application program interface (EMS-API) - Part 600-2: Common Grid Model Exchange Specification (CGMES) - Exchange profiles specification

57/2045/RR 2018-09 ACDV
  • ACDV
  • Approved for CDV

2019-09

2019-12

WG 13 Olivier AINE 2021-01
IEC 62325-451-7 ED1

Framework for energy market communications - Part 451-7: Balancing processes, contextual and assembly models for European style market

57/2144/CD 2019-05 CD
  • CD
  • Draft circulated as CD

2019-09

PCC
  • PCC
  • Preparation of CC document

2019-12

WG 16 Greta BONNARY 2022-04
IEC 62325-451-8 ED1

Framework for energy market communications - Part 451-8: HVDC processes, contextual and assembly models for European style market

57/2125/NP 2019-11 ACD
  • ACD
  • Approved for CD

2019-11

CD
  • CD
  • Draft circulated as CD

2020-04

WG 16 Greta BONNARY 2022-04
IEC 62325-451-10 ED1

Framework for energy market communications - Part 451-10: Profiles for energy consumption data (“My Energy Data”)

57/2087/CD 2017-10 ACDV
  • ACDV
  • Approved for CDV

2019-10

TCDV
  • TCDV
  • Translation of CDV

2019-12

WG 16 Eric Lambert 2020-12
PWI 62325-452-1 ED1

Day Ahead Market

PWI
  • PWI
  • Preliminary Work Item

2013-10

prePNW
  • prePNW
  • Preparation of NP document

WG 16
PWI 62325-452-4 ED1

Weather data to support market operations

PWI
  • PWI
  • Preliminary Work Item

2013-10

prePNW
  • prePNW
  • Preparation of NP document

WG 16
PWI 62325-452-5 ED1

Communications with Demand Response Systems

PWI
  • PWI
  • Preliminary Work Item

2013-10

prePNW
  • prePNW
  • Preparation of NP document

WG 16
PWI 62325-550-2 ED1

Common Dynamic Data Structures for DAM, RT, FTR

PWI
  • PWI
  • Preliminary Work Item

2013-10

prePNW
  • prePNW
  • Preparation of NP document

WG 16
PWI 62325-552-1 ED1

Dynamic Data Structures for DAM

PWI
  • PWI
  • Preliminary Work Item

2013-10

prePNW
  • prePNW
  • Preparation of NP document

WG 16
IEC 62351-3/AMD2 ED1

Amendment 2 - Power systems management and associated information exchange - Data and communications security - Part 3: Communication network and system security - Profiles including TCP/IP

57/2149/FDIS 2018-12 CFDIS
  • CFDIS
  • Draft circulated as FDIS

2019-10

PRVD
  • PRVD
  • Preparation of RVD document

2019-11

WG 15 Steffen Fries 2020-01
IEC 62351-4/AMD1 ED1

Amendment 1 - Power systems management and associated information exchange - Data and communications security - Part 4: Profiles including MMS and derivatives

57/2116/CDV 2019-07 PRVC
  • PRVC
  • Preparation of RVC

2019-11

2020-02

WG 15 Erik Andersen 2020-10
IEC 62351-5 ED1

Power systems management and associated information exchange - Data and communications security - Part 5: Security for IEC 60870-5 and derivatives

57/2122/RR 2019-07 ACD
  • ACD
  • Approved for CD

2019-07

CD
  • CD
  • Draft circulated as CD

2020-04

WG 15 Marco Grechi 2022-04
IEC 62351-6 ED1

Power systems management and associated information exchange - Data and communications security - Part 6: Security for IEC 61850

57/2033/CDV 2018-08 PRVC
  • PRVC
  • Preparation of RVC

2018-12

2019-03

WG 15 Herbert Falk 2020-09
IEC 62351-8 ED1

Power systems management and associated information exchange - Data and communications security - Part 8: Role-based access control

57/2069/CDV 2017-10 RFDIS
  • RFDIS
  • FDIS received and registered

2019-11

CFDIS
  • CFDIS
  • Draft circulated as FDIS

2020-01

WG 15 Steffen Fries 2020-04
IEC 62351-14 ED1

Power systems management and associated information exchange - Data and communications security - Part 14: Cyber security event logging

57/2162/CD 2016-12 CD
  • CD
  • Draft circulated as CD

2019-11

PCC
  • PCC
  • Preparation of CC document

2020-01

WG 15 Arijit Bose 2021-01
IEC TS 62351-100-3 ED1

Power systems management and associated information exchange – Data and communications security – Part 100-3: Conformance test cases for the IEC 62351-3, the secure communication extension for profiles including TCP/IP

57/2090/DTS

2018-01 BPUB
  • BPUB
  • Being published

2019-11

PPUB
  • PPUB
  • Publication published

2019-12

WG 15 Marco Grechi 2019-12
IEC TS 62351-100-4 ED1

Power systems management and associated information exchange – Data and communication security – Part 100-4: Conformance testing for IEC 62351-4

57/2007/NP 2018-10 ACD
  • ACD
  • Approved for CD

2018-10

CD
  • CD
  • Draft circulated as CD

2019-12

WG 15 Marc Lacroix 2021-06
IEC TS 62351-100-6 ED1

Power systems management and associated information exchange – Data and communications security – Part 100-6: Conformance testing for IEC 62351-6

57/2006/NP 2018-10 ACD
  • ACD
  • Approved for CD

2018-10

CD
  • CD
  • Draft circulated as CD

2019-12

WG 15 Marc Lacroix 2021-06
IEC 62488-3 ED1

Power line communication systems for power utility applications - Part 3: Digital Power Line Carrier (DPLC) terminals and hybrid ADPLC terminals

57/2095/CDV 2018-05 PRVC
  • PRVC
  • Preparation of RVC

2019-09

2019-12

WG 20 John Newbury 2020-08
PWI 62488-4 ED1

Broadband systems operating over EHV/HV/MV/LV electricity grids

PWI
  • PWI
  • Preliminary Work Item

2013-10

prePNW
  • prePNW
  • Preparation of NP document

WG 20