International Standards and Conformity Assessment for all electrical, electronic and related technologies

SC 65E

Devices and integration in enterprise systems

 
export to xls file

SC 65E Work programme (24)

Project

Reference

Document

Reference

Init.

Date

Current

Stage

Next

Stage

Working

Group

Project

Leader

Fcst. Publ.

Date

PNW 65E-704

ENTERPRISE-CONTROL SYSTEM INTEGRATION – Part 7 Alias Service Model

65E/704/NP PRVN
  • PRVN
  • Preparation of RVN

2020-06

2020-07

JWG 5 Chris Monchinski 2022-11
IEC 61987-31 ED1

IEC 61987, Part 31: List of Properties (LOP) of infrastructure devices for electronic data exchange – Generic structures

65E/705/CD 2018-09 ACDV
  • ACDV
  • Approved for CDV

2020-07

TCDV
  • TCDV
  • Translation of CDV

2021-10

WG 2 Klaus Bonnemann 2021-09
IEC 61987-32 ED1

IEC 61987, Part 32: Lists of properties (LOP) for I/O modules for electronic data exchange

65E/599/NP 2018-09 ACD
  • ACD
  • Approved for CD

2018-09

CD
  • CD
  • Draft circulated as CD

2019-12

WG 2 Klaus Bonnemann 2021-09
IEC 62453-71 ED1

Field device tool (FDT) interface specification – Part 71: OPC UA Information Model for FDT

65E/714/NP 2020-05 ACD
  • ACD
  • Approved for CD

2020-05

CD
  • CD
  • Draft circulated as CD

2021-01

WG 4 Christian Diedrich 2023-03
IEC TR 62541-1 ED3

OPC unified architecture - Part 1: Overview and concepts

65E/678/DTR

2017-07 RPUB
  • RPUB
  • Text for PUB received and registered

2020-07

BPUB
  • BPUB
  • Publication being printed

2020-10

WG 8 Ingo Weber 2020-11
IEC TR 62541-2 ED3

OPC unified architecture - Part 2: Security Model

65E/679/DTR

2017-07 RPUB
  • RPUB
  • Text for PUB received and registered

2020-07

BPUB
  • BPUB
  • Publication being printed

2020-10

WG 8 Ingo Weber 2020-11
IEC 62714-2 ED2

Engineering data exchange format for use in industrial automation systems engineering - Automation markup language - Part 2: Semantics libraries

65E/699/CD 2018-05 ACDV
  • ACDV
  • Approved for CDV

2020-07

TCDV
  • TCDV
  • Translation of CDV

2021-02

WG 9 Nicole Schmidt 2021-08
IEC 62714-5 ED1

Engineering data exchange format for use in industrial automation systems engineering - Automation Markup Language - Part 5: Communication

65E/729/CD 2019-11 CD
  • CD
  • Draft circulated as CD

2020-05

PCC
  • PCC
  • Preparation of CC document

2020-08

WG 9 Nicole Schmidt 2022-05
IEC 62769-1 ED2

Field device integration (FDI) - Part 1: Overview

65E/588/CDV 2017-05 RFDIS
  • RFDIS
  • FDIS received and registered

2020-02

CFDIS
  • CFDIS
  • Draft circulated as FDIS

2020-05

WG 7 Christian Diedrich 2020-11
IEC 62769-2 ED2

Field Device Integration (FDI) - Part 2: FDI Client

65E/589/CDV 2017-05 RFDIS
  • RFDIS
  • FDIS received and registered

2020-02

CFDIS
  • CFDIS
  • Draft circulated as FDIS

2020-05

WG 7 Christian Diedrich 2020-11
IEC 62769-3 ED2

Field Device Integration (FDI) - Part 3: FDI Server

65E/590/CDV 2017-05 RFDIS
  • RFDIS
  • FDIS received and registered

2020-02

CFDIS
  • CFDIS
  • Draft circulated as FDIS

2020-05

WG 7 Christian Diedrich 2020-11
IEC 62769-4 ED2

Field Device Integration (FDI) - Part 4: FDI Packages

65E/591/CDV 2017-05 RFDIS
  • RFDIS
  • FDIS received and registered

2020-02

CFDIS
  • CFDIS
  • Draft circulated as FDIS

2020-05

WG 7 Christian Diedrich 2020-11
IEC 62769-5 ED2

Field Device Integration (FDI) - Part 5: FDI Information Model

65E/592/CDV 2017-05 RFDIS
  • RFDIS
  • FDIS received and registered

2020-02

CFDIS
  • CFDIS
  • Draft circulated as FDIS

2020-05

WG 7 Christian Diedrich 2020-11
IEC 62769-6 ED2

Field Device Integration (FDI) - Part 6: FDI Technology Mapping

65E/593/CDV 2017-05 RFDIS
  • RFDIS
  • FDIS received and registered

2020-02

CFDIS
  • CFDIS
  • Draft circulated as FDIS

2020-05

WG 7 Christian Diedrich 2020-11
IEC 62769-7 ED2

Field Device Integration (FDI) - Part 7: FDI Communication Devices

65E/594/CDV 2017-05 RFDIS
  • RFDIS
  • FDIS received and registered

2020-02

CFDIS
  • CFDIS
  • Draft circulated as FDIS

2020-05

WG 7 Christian Diedrich 2020-11
IEC 62769-100 ED1

Field Device Integration (FDI) – Part 100: Profiles – Generic protocols

65E/739/FDIS 2017-10 CFDIS
  • CFDIS
  • Draft circulated as FDIS

2020-07

PRVD
  • PRVD
  • Preparation of RVD document

2020-08

WG 7 Christian Diedrich 2020-10
IEC 62769-101-1 ED2

Field device Integration (FDI) - Part 101-1: Profiles - Foundation Fieldbus H1

65E/620/CDV 2017-05 RPUB
  • RPUB
  • Publication received and registered

2020-03

BPUB
  • BPUB
  • Publication being printed

2020-06

WG 7 Christian Diedrich 2020-10
IEC 62769-101-2 ED2

Field Device Integration (FDI) - Part 101-2: Profiles - Foundation Fieldbus HSE

65E/621/CDV 2017-05 RPUB
  • RPUB
  • Publication received and registered

2020-03

BPUB
  • BPUB
  • Publication being printed

2020-06

WG 7 Christian Diedrich 2020-10
IEC 62769-115-2 ED1

Field Device Integration (FDI) – Part 115-2: Profiles – Modbus-RTU

65E/740/FDIS 2017-10 CFDIS
  • CFDIS
  • Draft circulated as FDIS

2020-07

PRVD
  • PRVD
  • Preparation of RVD document

2020-08

WG 7 Christian Diedrich 2020-10
IEC 62769-150-1 ED1

FIELD DEVICE INTEGRATION (FDI) – PART 150-1: Profiles – ISA100.11a

65E/584/CDV 2017-10 RFDIS
  • RFDIS
  • FDIS received and registered

2020-05

CFDIS
  • CFDIS
  • Draft circulated as FDIS

2020-08

WG 7 Christian Diedrich 2020-11
IEC 63082-2 ED1

Intelligent Device Management – Part 2: Normative Requirements and Recommendations

65E/688/NP 2020-02 ACD
  • ACD
  • Approved for CD

2020-02

CD
  • CD
  • Draft circulated as CD

2021-04

WG 10 Ian Verhappen 2023-04
IEC 63261 ED1

Representation of electrical & instrument objects in digital 3D plant models during engineering

65E/656/NP 2019-07 ACD
  • ACD
  • Approved for CD

2019-07

CD
  • CD
  • Draft circulated as CD

2019-12

WG 13 Carsten Bödege 2022-06
IEC 63270 ED1

Industrial automation equipment and systems - Predictive maintenance

65E/659/NP 2019-10 ACD
  • ACD
  • Approved for CD

2019-10

CD
  • CD
  • Draft circulated as CD

2020-06

WG 12 Chengcheng Wang 2022-08
IEC 63280 ED1

Automation engineering of modular systems in the process industry – General concept and interfaces

65E/663/NP 2019-12 ACD
  • ACD
  • Approved for CD

2019-12

CD
  • CD
  • Draft circulated as CD

2020-06

WG 14 Gerald Mayr 2022-09